Quick answers
What is this project?
Diversion of Forest Land of 0.0136Ha. for access to Dhaba belonging to Smt. Shakuntla Devi W/o Late Sh. Madan Lal, Sh. Amarjeet Singh, Sh. Rakesh Kumar, Sh. Gurcharan Singh, and Sh. Surjeet Singh Ss/o Late Sh. Madan Lal, Smt. Surinder Kaur, Smt. Bimla Devi and Smt. Darshna Devi Dd/o Late Sh. Madan Lal, situated on Kurukshetra - Dhand road (MDR-116), at Km 3.370 (LHS), Village Raogarh, Tehsil Thanesar, Distt. Kurukshetra (Hr) is a lapsed building project in Raogarh, Thanesar, Kurukshetra, Haryana. The site covers 1.5 acres.
Who is building it?
The applicant is Amarjeet.
Has it been approved?
No. The application was lapsed on 15 Oct 2025, so it is no longer under consideration.
Where is it?
In Raogarh, Thanesar, Kurukshetra, Haryana.
How big is it?
It has a stated cost of ₹1 crore; a site of 1.5 acres and 140 m² of forest land.
When was it filed?
The application was filed on 3 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 15 Oct 2025 |
| Application filed | 3 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Amarjeet |
| Land area | 1.5 acres (0.6 ha) |
| Forest land | 140 m² |
| Project cost | ₹1 crore |
| Village / locality | Raogarh |
| Taluk / tehsil | Thanesar |
| District | Kurukshetra |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02177 |
In context
39 applications in Kurukshetra since January 2022 are in the same category (Buildings & townships): 9 approved, 9 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 1.5 acres, this one is smaller than 85% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raogarh, Thanesar, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for underground Laying of 4-Inch HPOIL GAS Pipeline… — lapsed, 1.7 km away
- Road project by Antique India Private Limited — forest land use approved, 2.6 km away
- Diversion of forest land for underground Laying of 63mm MDPE HPOIL GAS… — lapsed, 3.9 km away
- New Retail Outlet of BPCL at Village Kirmach Distt Kurukshetra — forest land use approved, 4.1 km away
- Diversion of Forest Land of 0.0125Ha. for access to Hotel with Restaurant… — forest land use approved, 4.3 km away
- Pinnacle Medical Centre & Research Institute — under environmental review, 6 km away
- Nagpal Multispecialty Hospital — lapsed, 6.6 km away
- Nagpal Multispecialty Hospital — lapsed, 6.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.