Quick answers
What is this project?
Retail Outlet of Hpcl on Bond Kalan- Charkhi Dadri Road Old Mdr-124 (New SH -34), Km. 23.505, Lhs by HPCL is an approved fuel station in Rawaldhi, Dadri, Charki Dadri, Haryana. The site covers 0.6 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Jul 2026), as of 27 Nov 2026.
Where is it?
In Rawaldhi, Dadri, Charki Dadri, Haryana.
How big is it?
It has a stated cost of ₹95 lakh; a site of 0.6 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 29 Mar 2026.
Project details
| Official title | Retail Outlet of Hpcl on Bond Kalan- Charkhi Dadri Road Old Mdr-124 (New SH -34), Km. 23.505, Lhs, at Village Rawaldhi, Tehsil Dadri, District Charkhi Dadri, Haryana |
|---|---|
| Status | Forest land use approved |
| Status since | 20 Jul 2026 |
| Application filed | 29 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,500 m² |
| Forest land | 1,000 m² |
| Project cost | ₹95 lakh |
| Village / locality | Rawaldhi |
| Taluk / tehsil | Dadri |
| District | Charki Dadri |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02209 |
In context
26 applications in Charki Dadri since January 2022 are in the same category (Fuel stations): 17 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.6 acres, this one is smaller than 65% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rawaldhi, Dadri, Charki Dadri, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Water Supply Pipe Line From Ghikada Water Works to Fire Station… — lapsed, 2.3 km away
- Diversion of Forest Land for Widening and Strengthening of Road From Rd 25.380… — lapsed, 2.4 km away
- Const. of ROB on LC No. 35 a Km. 56/2-3 on Rewari Hisar Rail Section at Ch.… — forest land use approved, 3.1 km away
- Full Title of the Project: Access to Nayara Engery Limited Retail outlet along… — forest land use approved, 3.3 km away
- Pipeline Along Dadri Disty in Bhiwani — lapsed, 3.7 km away
- Kasni Kohlawas Lamba Misri Sanwar :- Estimate for Providing Raw Water… — lapsed, 3.9 km away
- Approach Access for Retail Outlet of Iocl Ksk on Samaspur to Kaliawas Road… — forest land use approved, 4.4 km away
- Diversion of forest land of 0.0931 hectare for development of our proposed… — forest land use approved, 4.4 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Charki Dadri
- Diversion of Forest Land measuring 0.0940 ha for access to the proposed retail… — initial checks
- Diversion of Forest Land (0.1265 Ha.) for Access to the Proposed Fuel Station… — under forest review
- Diversion of Forest Land of Retail Outlet on Adampur Dadhi to Jhojhu Kalan… — forest land use approved
- Hpcltd Retail Outlet on Mdr-126 (Jhojhu Khurd to Kadma Road) at Km 12.830, Lhs… — forest land use approved
5 Hindustan Petroleum Corporation (HPCL) projects in Charki Dadri
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.