Quick answers
What is HPCL CGD Project?
HPCL CGD Project is a lapsed pipeline project in Pindara, Jind, Haryana. The site covers 3.9 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 6 Sept 2023, so it is no longer under consideration.
Where is it?
In Pindara, Jind, Haryana.
How big is it?
It has a stated cost of ₹520 crore; a site of 3.9 acres and 3.9 acres (1.6 ha) of forest land.
When was it filed?
The application was filed on 4 Jun 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Sept 2023 |
| Application filed | 4 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3.9 acres (1.6 ha) |
| Forest land | 3.9 acres (1.6 ha) |
| Project cost | ₹520 crore |
| Village / locality | Pindara |
| Taluk / tehsil | Jind |
| District | Jind |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02240 |
In context
15 applications in Jind since January 2022 are in the same category (Pipelines): 3 approved, 2 filed or under review, and 10 withdrawn, lapsed or rejected. At 3.9 acres, this one is larger than 62% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pindara, Jind, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hpcl Cgd Project 0.23 Ha. Arae in Jind — lapsed, 1.2 km away
- Diversion of 0.0079 ha Forest land for access to proposed Industrial Unit… — forest land use approved, 5 km away
- Ch. RANBIR SINGH UNIVERSITY" ONNH- 709A(SANT KABIR SINGH CHOWK TO JIND -… — lapsed, 5.7 km away
- Chord line between Bishanpura -jind city (5.21 km) of Northern Railway — more information requested, 6.5 km away
- Diversion of Forest Land for approach access to Proposed Site of MS/HSD… — forest land use approved, 6.8 km away
- NOC case of Permission for Diversion of 0.0952 Hec. forest land for… — lapsed, 7.1 km away
- Underpass — lapsed, 7.1 km away
- Widening and Strengthening of Igrah to Buwana road of Julana Constituency — lapsed, 7.3 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Jind
10 Hindustan Petroleum Corporation (HPCL) projects in Jind
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.