Project details
| Official title | Access Permission for Hpcl Retail Outlet on Rohtak-Panipat Road NH-709 at Chainage 72.361(Rhs) Centre of Plot at Village Naultha, Tehsil Panipat, District Panipat, State Haryana |
|---|---|
| Status | Forest land use approved |
| Status since | 26 Mar 2025 |
| Application filed | 18 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,300 m² |
| Forest land | 1,530 m² |
| Project cost | ₹50 lakh |
| Village / locality | Naultha |
| Taluk / tehsil | Israna |
| District | Panipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02562 |
In context
17 applications in Panipat since January 2022 are in the same category (Fuel stations): 11 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.8 acres, this one is larger than 88% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naultha, Israna, Panipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Stiching and Packing of M/s Pushpa Wool Corporation — lapsed, 1.3 km away
- Godown belonging to Sh. Narender Kumar Piplani — lapsed, 1.4 km away
- Undergound Ofc in Naultha City ,tehsil Israna, District Panipat Haryan — forest land use approved, 1.8 km away
- Diversion of forest land for Construction of 33 KV line with 150 MM2 ACSR… — lapsed, 1.9 km away
- 33 KV line with 150 MM2 ACSR Conductor from 33 KV S/Stn, HVPNL, Bhudsyam to… — more information requested, 1.9 km away
- Proposed Path for setting up of an Industrial Unit (Lotus India Spinning… — forest land use approved, 2.1 km away
- Proposed Naulatha Cement Grinding Unit with Cement Production capacity of 1 x… — cleared for impact study, 2.1 km away
- Manufacturing Unit of Fabric — more information requested, 2.3 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Panipat
- Diversion of forest land 0.0587Ha. for access to Retail Outlet on Madlauda -… — forest land use approved
- Diversion of Forest Land For access to the proposed MS/HSD Filling station of… — lapsed
- Diversion of Forest Land For access to the proposed MS/HSD Filling station of… — lapsed
5 Hindustan Petroleum Corporation (HPCL) projects in Panipat
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.