Project details
| Status | More information requested |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 8 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,600 m² |
| Forest land | 240 m² |
| Project cost | ₹40 lakh |
| Village / locality | Chhotabas |
| Taluk / tehsil | Radaur |
| District | Yamunanagar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-02675 |
In context
37 applications in Yamunanagar since January 2022 are in the same category (Fuel stations): 18 approved, 9 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.4 acres, this one is smaller than 84% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chhotabas, Radaur, Yamunanagar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 0.0030Ha. for access to Manufacturing Unit… — lapsed, 700 m away
- Diversion of Forest Land of 0.0029Ha. for access to Manufacturer of Food &… — lapsed, 750 m away
- Diversion of 2.34 Ha. of Forest Land for Laying of Interlocking Tiles (IPB) on… — lapsed, 1 km away
- Side Drain on Saharanpur Kurukshetra Road — lapsed, 1.3 km away
- Diversion of forest land of 0.8543Ha. for Strengthening of Berm of S.K. road… — under forest review, 1.6 km away
- Industrial project by M/s Christian Pfeiffer India Pvt. Ltd. — forest land use approved, 1.8 km away
- Hafed Turmeric Plant — lapsed, 2.1 km away
- Existing Formaldehyde manufacturing unit of 130 TPD Capacity by M/S Apcolite… — lapsed, 2.6 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Yamunanagar
- Diversion of forest land 0.0515Ha. for access to HPCL Retail Outlet on… — initial checks
- Diversion of forest land 0.1353 Ha. for access to HPCL Retail Outlet on Kala… — initial checks
- Diversion of forest land 0.0551Ha. for access to HPCL Retail Outlet ON… — more information requested
- diversion of forest land 0.0199Ha. for access to HPCL Retail Outlet ON… — in-principle approval, conditions pending
- Diversion of forest land 0.0615Ha. for access to HPCL Retail Outlet on… — forest land use approved
- HPCL Retail Outlet on Buria - Jagadhari Road, Village Buria, Tehsil Jagadhari,… — forest land use approved
14 Hindustan Petroleum Corporation (HPCL) projects in Yamunanagar
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.