LapsedBuildings & townships · Panchkula, Haryana

Diversion of forest land for Construction of 25KV Electric Line from 66KV Sub Station, HVPNL, Taparin to the Stylam Industries Limited

Diversion of forest land for Construction of 25KV Electric Line from 66KV Sub Station, HVPNL, Taparin to the Stylam Industries Limited is a lapsed building project in Manak Tabra, Panchkula, Haryana. The site covers 1 acre. Its stated project cost is ₹2.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 25 Apr 2025).

See it on the live map All projects in Panchkula

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land for Construction of 25KV Electric Line from 66KV Sub Station, HVPNL, Taparin to the Stylam Industries Limited is a lapsed building project in Manak Tabra, Panchkula, Haryana. The site covers 1 acre.

Who is building it?

The applicant is Uttar Haryana Bijli Vitran Nigam.

Has it been approved?

No. The application was lapsed on 25 Apr 2025, so it is no longer under consideration.

Where is it?

In Manak Tabra, Panchkula, Haryana.

How big is it?

It has a stated cost of ₹2.5 crore; a site of 1 acre and 1 acres (0.4 ha) of forest land.

When was it filed?

The application was filed on 5 Aug 2024.

Project details

Official titleDiversion of forest land for Construction of 25KV Electric Line from 66KV Sub Station, HVPNL, Taparin to the Stylam Industries Limited at Village – Manak Tabra in Distt - Panchkula (HR)
StatusLapsed
Status since25 Apr 2025
Application filed5 Aug 2024
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantUttar Haryana Bijli Vitran Nigam
Land area1 acres (0.4 ha)
Forest land1 acres (0.4 ha)
Project cost₹2.5 crore
Village / localityManak Tabra
Taluk / tehsilPanchkula
DistrictPanchkula
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-02692

In context

64 applications in Panchkula since January 2022 are in the same category (Buildings & townships): 18 approved, 10 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 75% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Manak Tabra, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Uttar Haryana Bijli Vitran Nigam in Panchkula

All 20 Uttar Haryana Bijli Vitran Nigam projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.