Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Oct 2024 |
| Application filed | 17 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Sde Phe Palwal |
| Land area | 600 m² |
| Forest land | 560 m² |
| Project cost | ₹13.6 crore |
| Village / locality | Ghasera |
| Taluk / tehsil | Nuh |
| District | Nuh |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03081 |
In context
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ghasera, Nuh, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of U/G Ofc From Ghansera to Tain Vill in Nuh(Mewat) District — forest land use approved, 1.4 km away
- Diversion of Forest Land for Establish a Retail Oultlet of Iocl on Nuh to… — more information requested, 1.5 km away
- IOCL Retail outlet along Nuh to Palwal road (SH-13) — lapsed, 1.5 km away
- Establish a Retail Outlet of IOCL for Central Jail Nuh on Nuh to Palwal road,… — forest land use approved, 1.9 km away
- M/S Indian Oil Corporation LTD on SH-13 (Nuh to Palwal Road), at Km- 2.335… — lapsed, 1.9 km away
- Industrial and Logistic Park (Light and Heavy Engineering/Manufacturing/Assembl… — initial checks, 2.4 km away
- Diversion of Forest Land for Approach Access to the Proposed Site of… — initial checks, 2.4 km away
- Diversion of Forest Land for Special Repair for Reconstruction by Wdg., Stg.… — lapsed, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.