Project details
| Official title | Permission of Forest Land for Const.Of Road Access for Banquet Hall (C.M. Celebration) Location at Khasra No. 442//1,2,3 (Ahlisadar-Haripura Road) at Rd Km. 0.183 (Rhs) , in Village Hizrwan Khurd Tehsil & Distt :- Fatehabad, Haryana |
|---|---|
| Status | Forest land use approved |
| Status since | 21 Apr 2026 |
| Application filed | 16 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dalbir Singh |
| Use | Commercial |
| Land area | 2.8 acres (1.1 ha) |
| Forest land | 30 m² |
| Plot area | 33 m² (355 sq ft) |
| Project cost | ₹80 lakh |
| Village / locality | Hijraon Khurd |
| Taluk / tehsil | Fatehabad |
| District | Fatehabad |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03241 |
In context
16 applications in Fatehabad since January 2022 are in the same category (Buildings & townships): 7 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 2.8 acres, this one is smaller than 75% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hijraon Khurd, Fatehabad, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rediversion of 0.5538 Ha. Forest Land for laying of 8" Dia Natural Gas Steel… — more information requested, 3.4 km away
- M/s Nayara Energy Ltd. Retail outlet along Sirsa to Hisar road on NH-09 (Old… — more information requested, 4.1 km away
- Diversion of forest land for access to the Proposed Retail Outlet of Reliance… — lapsed, 4.2 km away
- New Retail Outlet for access permission to along Sirsa To Hisar Road KM.… — lapsed, 4.3 km away
- For Permission of Laying of 400 Mm Rcc Np2 Pipe Inlet Channel Distt. Fatehabad… — more information requested, 4.7 km away
- Access of Road for Prop. Retial Outlet Iocl Fatehabad — lapsed, 6.4 km away
- Diversion of Forest Land for approach access to the Proposed Site of M/s… — lapsed, 7.7 km away
- Diversion of Forest Land for approach access to the Proposed Site of M/s… — lapsed, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.