Project details
| Status | More information requested |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 26 Feb 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Fuel stations |
| Applicant | Adani Total Gas Limited |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 510 m² |
| Project cost | ₹5 crore |
| Village / locality | Sarai Bahadurnagar Surani |
| Taluk / tehsil | Ateli |
| District | Mahendragarh |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03685 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 17 Apr 2026 | Lapsed | 2.1 acres | ₹5 crore |
| Change of use filed 26 Feb 2026 (this page) | More information requested | 2.1 acres | ₹5 crore |
In context
30 applications in Mahendragarh since January 2022 are in the same category (Fuel stations): 15 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.1 acres, this one is larger than 97% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarai Bahadurnagar Surani, Ateli, Mahendragarh, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — under forest review, 0 m away
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — more information requested, 0 m away
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — lapsed, 0 m away
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — lapsed, 0 m away
- Laying of Proposed 4" Dia. Natural Gas pipeline connectivity to Adani CGS… — lapsed, 450 m away
- Diversion of Forest land for access to School belonging to Maru Ram Dehat Bal… — more information requested, 600 m away
- Diversion of forest land for construction of side drain along Rewari to… — forest land use approved, 2.6 km away
- Widening and Stg. of road from Bachhod to Kunjpura Shyampura road — lapsed, 3.5 km away
More from Adani Total Gas Limited in Mahendragarh
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — under forest review
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — more information requested
- From Start Point of NH-11 to Chhatarpati Filling Station (ATGL DODO) — lapsed
- Neerpur Bus Station to Start Point of NH-11 — under forest review
6 Adani Total Gas projects in Mahendragarh
All 48 Adani Total Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.