Project details
| Official title | Diversion of forest land for providing water supply system in 194 Battalion RAF(Rapid Action Force) Bawana, CISF CAMP at village Indri by installation of 11 Nos. Tubewell, Pump Chamber and Laying of Pipeline along Nuh Sub Branch near Rajkameo village under Tehsil and Distt. Nuh, Haryana. |
|---|---|
| Status | Lapsed |
| Status since | 29 Apr 2025 |
| Application filed | 19 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Public Health Engineering Department, Palwal |
| Land area | 700 m² |
| Forest land | 710 m² |
| Project cost | ₹12 crore |
| Village / locality | Rojka Meo |
| Taluk / tehsil | Nuh |
| District | Nuh |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03696 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2024 (this page) | Lapsed | 0.2 acres | ₹12 crore |
| New project filed 19 Aug 2024 | Lapsed | 0.2 acres | ₹12 crore |
In context
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rojka Meo, Nuh, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land for providing water supply system in 194 Battalion… — lapsed, 0 m away
- Water Works and Laying of Pipe Line in Forest and Non-Forest Area — forest land use approved, 350 m away
- Application for Extension in Validity of Environmental Clearance (EC) for… — returned to applicant, 1.2 km away
- Proposed Lithium-Ion battery cell manufacturing unit at Industrial plot no.-… — environmental approval granted, 1.9 km away
- Proposed Lithium-Ion battery cell manufacturing unit at Industrial plot no.-… — cleared for impact study, 1.9 km away
- Affordable Group Housing Society in area of 6.36875 acres/25,773.3759 sqm… — environmental approval granted, 3.7 km away
- Ware House Project — more information requested, 4.3 km away
- Diversion of forest land for access to approach road from the proposed site of… — lapsed, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.