Quick answers
What is this project?
Diversion of Forest Land for approach access to Proposed Site of Retail Outlet of M/s Nayara Energy Limited along Kalka - Baddi Road is a lapsed fuel station in Kherianwali, Kalka, Panchkula, Haryana. The site covers 0.3 acres.
Who is building it?
The applicant is Nayara Energy Limited.
Has it been approved?
No. The application was lapsed on 18 Dec 2025, so it is no longer under consideration.
Where is it?
In Kherianwali, Kalka, Panchkula, Haryana.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.3 acres and 50 m² of forest land.
When was it filed?
The application was filed on 1 Nov 2025.
Project details
| Official title | Diversion of Forest Land for approach access to Proposed Site of Retail Outlet of M/s Nayara Energy Limited along Kalka - Baddi Road situated at Village – Kherawali, Tehsil – Kalka, Distt. – Panchkula (HR) |
|---|---|
| Status | Lapsed |
| Status since | 18 Dec 2025 |
| Application filed | 1 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Nayara Energy Limited |
| Land area | 1,400 m² |
| Forest land | 50 m² |
| Project cost | ₹50 lakh |
| Village / locality | Kherianwali |
| Taluk / tehsil | Kalka |
| District | Panchkula |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03718 |
In context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kherianwali, Kalka, Panchkula, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for access to approach road to the Proposed Site of… — more information requested, 950 m away
- Diversion of Forest Land for access to approach road to the Proposed Site of… — lapsed, 950 m away
- City Gas Distribution Project — lapsed, 1.1 km away
- Diversion of Forest Land for improvement of L/R Kalka Paploha Kheranwali Road — lapsed, 2.1 km away
- Baswal-Khera Boulder,Gravel and Sand Mining Project — under environmental review, 2.6 km away
- Baswal-Khera Boulder,Gravel and Sand Mining Project — cleared for impact study, 2.6 km away
- Creation of Lilo of one circuit of proposed 66kV D/C Nanakpur-Pinjore line… — forest land use approved, 2.7 km away
- Permission for the Construction of Residential Apartment Set for Living (for… — lapsed, 2.8 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.