Project details
| Official title | Preparation of Detailed Project Report / Feasibility Study Report for Construction of 4 Lanning With Paved Shoulder of Gurgaon-Alwar Road (Nh-248a) Section From Nuh to Ferozepur Jhirka Upto Rajasthan Border Km. 46.95 to 81.00 & 83.35 to 95.958 in Nuh District |
|---|---|
| Status | More information requested |
| Status since | 24 Apr 2026 |
| Application filed | 22 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Pwd Bandr Mewat |
| Land area | 112.6 acres (45.6 ha) |
| Forest land | 112.6 acres (45.6 ha) |
| Project cost | ₹480.4 crore |
| Village / locality | Dhamala |
| Taluk / tehsil | Ferozepur Jhirka |
| District | Nuh |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-03801 |
In context
7 applications in Nuh since January 2022 are in the same category (Roads & highways): 1 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhamala, Ferozepur Jhirka, Nuh, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for approach access to Proposed Site of Retail Outlet… — forest land use approved, 1.4 km away
- Diversion of Forest Land for approach access to Proposed Site of Industrial… — lapsed, 2 km away
- Diversion of Forest Land for approach access to Proposed Site of Industrial… — lapsed, 2.1 km away
- Establish of CNG Station on Gurugram Alwar road, RHS — forest land use approved, 2.9 km away
- Diversion of Forest Land for approach access to Proposed Site of Retail Outlet… — forest land use approved, 3.4 km away
- Laying of Underground Ofc From Sakra (64) to Karaheri (50) in Nuh (Mewat) — in-principle approval, conditions pending, 3.4 km away
- Diversion of forest land for approach access to proposed site of M/s Carabao… — more information requested, 3.5 km away
- Diversion of Forest Land for construction of Sewerage Treatment Plant — lapsed, 3.5 km away
More from Pwd Bandr Mewat in Nuh
- Diversion of Forest land for 4-lanning of Hodal-Nuh Pataudi-Patauda road from… — lapsed
- Work of Strengthening of Road From Km 24.50 to Km 46.95 Including Improvement… — lapsed
- Diversion of Forest Land for Special Repair for Reconstruction by Wdg., Stg.… — lapsed
- Diversion of Forest Land for Special Repair for Reconstruction by Wdg., Stg.… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.