Project details
| Status | More information requested |
|---|---|
| Status since | 11 Mar 2024 |
| Application filed | 2 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | The Panipat Cooperative Sugar Mills Limited,panipat |
| Land area | 500 m² |
| Forest land | 460 m² |
| Project cost | ₹1 crore |
| Village / locality | Hartari |
| Taluk / tehsil | Panipat |
| District | Panipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04006 |
In context
20 applications in Panipat since January 2022 are in the same category (Power): 0 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 100% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hartari, Panipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New 90 KLPD distillery consisting of A 60 KLPD new plant based on… — environmental approval granted, 250 m away
- Diversion of Forest Land of 1.0031ha. for Workorder of Supply of Plant and… — lapsed, 950 m away
- Diversion of Forest Land of 0.0239Ha. for access to Industrial Plotted Colony… — forest land use approved, 1.3 km away
- Diversion of forest land for construction of ROB at Lc No. 58-C Km.67/5-6 and… — lapsed, 1.8 km away
- Project by M/s Devgiri Overseas Pvt. Ltd. — lapsed, 2.6 km away
- Project by M/s Devgiri Overseas PVT. Ltd. — lapsed, 2.9 km away
- Godown belonging to Sh. Narender Kumar Piplani — lapsed, 3 km away
- 4" NBCS Steel Pipe/125/90mm MDPE Natural gas pipeline of Indian Oil-Adani Gas… — lapsed, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.