Project details
| Official title | Construction of RCC Tank, Pump Chamber, RCC Silt Catch Pit at Rd-10920-R on Sunder Sub Branch Canal for Water Works at Village Kunger, Tehsil Bawani Khera, District Bhiwani., Haryana. |
|---|---|
| Status | Under forest review |
| Status since | 6 Nov 2026 |
| Application filed | 16 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Public Health Engineering Department,Haryana |
| Land area | 100 m² |
| Forest land | 260 m² |
| Project cost | ₹6.3 crore |
| Village / locality | Kungar |
| Taluk / tehsil | Bawani Khera |
| District | Bhiwani |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04208 |
In context
14 applications in Bhiwani since January 2022 are in the same category (Pipelines): 2 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kungar, Bawani Khera, Bhiwani, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of R.C.C Tank, Pump Chamaber, R.C.C. Slit Catch Pit. — lapsed, 0 m away
- Diversion of Forest land for establishment of Retail Outlet of B.P.C. L On… — lapsed, 6.1 km away
- Dinesh Stone Crusher — lapsed, 6.8 km away
- Dinesh Stone Crusher — lapsed, 6.8 km away
- CNG Station of M/s Adani Total Gas Ltd. on NH-10 (New NH-09) Rohtak-Hisar Road… — forest land use approved, 7.4 km away
- Access Permission for Hpcl Retail Outlet on Delhi-Hissar-Sirsa Road, NH-9 at… — lapsed, 7.6 km away
- Diversion of Forest Land for Hpcl Retail Outlet on Delhi-Hissar-Sirsa Road,… — forest land use approved, 7.6 km away
- CNG Station of ATGL, on Delhi-Hisar Road — lapsed, 7.7 km away
More from Public Health Engineering Department,Haryana in Bhiwani
- Laying of (600mm id) Di Pipe Line for Raw Water Arrangement for 1st and 2nd… — initial checks
- Laying of DI Rising Pipe Line from Siwani Canal to Water Works Behal along… — more information requested
- Raw Water arrangement existing water works — forest land use approved
- Raw Water arrangement for Existing water works — under forest review
- Construction of R.C.C Tank, Pump Chamaber, R.C.C. Slit Catch Pit. — lapsed
- Laying of (400mm i/d) DI Pipe for Raw Water Arrangement for Existing water works — in-principle approval, conditions pending
13 Public Health Engineering Department,Haryana projects in Bhiwani
All 29 Public Health Engineering Department,Haryana projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.