Quick answers
What is New retail Outlet IOCL at Karah Kurukshetra?
New retail Outlet IOCL at Karah Kurukshetra is an approved fuel station in Kara, Pehowa, Kurukshetra, Haryana. The site covers 1 acre.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 21 Mar 2025), as of 27 Nov 2026.
Where is it?
In Kara, Pehowa, Kurukshetra, Haryana.
How big is it?
It has a stated cost of ₹1.5 crore; a site of 1 acre and 870 m² of forest land.
When was it filed?
The application was filed on 17 Sept 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 21 Mar 2025 |
| Application filed | 17 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 870 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Kara |
| Taluk / tehsil | Pehowa |
| District | Kurukshetra |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04360 |
In context
25 applications in Kurukshetra since January 2022 are in the same category (Fuel stations): 15 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1 acre, this one is larger than 96% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kara, Pehowa, Kurukshetra, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail out let of IOCL on Pehowa –Cheeka road (SH-06), Km 120-121, LHS — lapsed, 0 m away
- Diversion of Forest land for creation of LILO of One Circuit of 220 KV D/C… — forest land use approved, 4.4 km away
- 33 KV Line from 220 KV Sub-Station Neemwala via Village Seonsar to existing 33… — forest land use approved, 5.5 km away
- Industrial project by Sainisons Paper Industries Pvt Ltd — lapsed, 5.6 km away
- Diversion of Forest Land of 0.0041Ha. for access to School of Institute of… — forest land use approved, 7.3 km away
- Construction of New Road from Pehowa to Polar — more information requested, 7.9 km away
- Construction of New Road from Pehowa to Polar — lapsed, 7.9 km away
- New Retail Outlet IOCL at Pehowa Kurukshetra — forest land use approved, 9.9 km away
More from Indian Oil Corporation Limited (IOCL) in Kurukshetra
- Diversion of forest land 0.0445Ha. for access to IOCL Retail Outlet between Km… — forest land use approved
- IOCL Retail Outlet Village Mathana — lapsed
- Iocl Retail Outlet Hathira — forest land use approved
- New Retail Out Let at Ismailabad Kurukshetra — lapsed
- New Retail out let of IOCL on Pehowa –Galedwa road (ODR), Km 13-14, LHS at… — lapsed
- New Retail Outlet IOCL at Pehowa Kurukshetra — forest land use approved
10 Indian Oil Corporation (IOCL) projects in Kurukshetra
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.