Quick answers
What is this project?
Diversion of 0.092 Ha. Of forest land for Constructions of Nala from Shankar Shuttering Store to Chawla main Jandli, Kanwla Road, Ambala City, Ward No. 15 is a lapsed road project in Jandli, Ambala, Haryana. The site covers 0 acres.
Who is building it?
The applicant is Sanjeev Kumar.
Has it been approved?
No. The application was lapsed on 9 Oct 2024, so it is no longer under consideration.
Where is it?
In Jandli, Ambala, Haryana.
How big is it?
It has a stated cost of ₹8 lakh; a site of 0 acres and 90 m² of forest land.
When was it filed?
The application was filed on 12 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Oct 2024 |
| Application filed | 12 Jun 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Sanjeev Kumar |
| Land area | 100 m² |
| Forest land | 90 m² |
| Project cost | ₹8 lakh |
| Village / locality | Jandli |
| Taluk / tehsil | Ambala |
| District | Ambala |
| State | Haryana |
| Location from | Site area on record |
| Our reference | WID-HR-04550 |
In context
30 applications in Ambala since January 2022 are in the same category (Roads & highways): 6 approved, 6 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jandli, Ambala, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mehra Hospital — lapsed, 0 m away
- Nala From Shankar Shuttering to Chawla Main Jandli Kawla Road Ambala City Ward… — lapsed, 0 m away
- Drain Along road in Jandli Ambala — forest land use approved, 50 m away
- PERMISSION OF DIVERSION OF FOREST LAND AREA MEASURING 0.0069 Ha FOR ACCESS TO… — lapsed, 1.6 km away
- Proposed Residential Group Housing Colony by M/s Imperial Developers and others — environmental approval granted, 1.9 km away
- NOC for diversion of forest land of 0.03345 hectare area for our Retail Outlet… — forest land use approved, 2.4 km away
- Diversion of 0.15 Ha of Forest Land for Construction of Side Drain Along… — lapsed, 2.6 km away
- S.P. Office, Ambala (30.37769, 76.78443) to POWERGRID Manhole near Civil… — lapsed, 2.9 km away
More from Sanjeev Kumar in Ambala
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.