Quick answers
What is this project?
Div. Of 0.0975 Ha. Of Forest Land For Proposed Pipe Line From Patti Afgan To Proposed Water Treatment Plant (N.G.T) At Land Of Patti Afgan Panchayat In Kaithal Distt., Under Forest Division & Distt. Kaithal is a lapsed pipeline project in Patti Afghan, Kaithal, Haryana. The site covers 0.2 acres.
Who is building it?
The applicant is Executive Engineer, Panchayati Raj P.W. Divn. Kaithal.
Has it been approved?
No. The application was lapsed on 31 Oct 2024, so it is no longer under consideration.
Where is it?
In Patti Afghan, Kaithal, Haryana.
How big is it?
It has a stated cost of ₹70 lakh; a site of 0.2 acres and 980 m² of forest land.
When was it filed?
The application was filed on 20 Nov 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Oct 2024 |
| Application filed | 20 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer, Panchayati Raj P.W. Divn. Kaithal |
| Land area | 1,000 m² |
| Forest land | 980 m² |
| Project cost | ₹70 lakh |
| Village / locality | Patti Afghan |
| Taluk / tehsil | Kaithal |
| District | Kaithal |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04611 |
In context
20 applications in Kaithal since January 2022 are in the same category (Pipelines): 2 approved, 12 filed or under review, and 6 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 85% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Patti Afghan, Kaithal, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GODOWN OF SH. GAGAN SARNA S/o SH. ASHWANI SARNA SITUATED ALONG CHEEKA ROAD — lapsed, 150 m away
- Diversion of forest land for access to the Proposed Retail Outlet of Nayara… — lapsed, 200 m away
- Diversion of Forest Land of 0.0107Ha. for access to Middle School of Gayatri… — forest land use approved, 350 m away
- Diversion of Forest Land of 0.0105Ha. for access to Dharam Kaanta/Godown… — lapsed, 450 m away
- Diversion of Forest Land of 0.0072Ha. for access to Factory belonging to Smt.… — forest land use approved, 450 m away
- Diversion of forest land for access to the Proposed Retail Outlet of Reliance… — forest land use approved, 700 m away
- Remediation and Reclamation of Existing Dumpsite and construction, operation… — environmental approval granted, 2 km away
- Laying of Gas pipelline along Parshuram Chowk Kaithal to Vishwakarma (Nayara)… — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.