Quick answers
What is this project?
Diversion of Forest land for access to retail outlet of BPCL on Jhajjar to Ch. Dadri road, NH-334B, Km stone 160.257, Mustil No. 35, Killa No. 4 is an approved fuel station in Imlota, Dadri, Charki Dadri, Haryana. The site covers 0.6 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Jan 2026), as of 27 Nov 2026.
Where is it?
In Imlota, Dadri, Charki Dadri, Haryana.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.6 acres and 880 m² of forest land.
When was it filed?
The application was filed on 29 Jun 2025.
Project details
| Official title | Diversion of Forest land for access to retail outlet of BPCL on Jhajjar to Ch. Dadri road, NH-334B, Km stone 160.257, Mustil No. 35, Killa No. 4 at village Imlota, Distt. Charkhi Dadri, Haryana. |
|---|---|
| Status | Forest land use approved |
| Status since | 30 Jan 2026 |
| Application filed | 29 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 2,500 m² |
| Forest land | 880 m² |
| Project cost | ₹50 lakh |
| Village / locality | Imlota |
| Taluk / tehsil | Dadri |
| District | Charki Dadri |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04708 |
In context
26 applications in Charki Dadri since January 2022 are in the same category (Fuel stations): 17 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.6 acres, this one is smaller than 65% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Imlota, Dadri, Charki Dadri, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Digging of Imlota Open Drain from Loharu Feeder along Badhwana Disty. to… — lapsed, 500 m away
- New Cng Station at Vill Imlota — forest land use approved, 800 m away
- M/s INDIAN OIL CORPORATION Ltd. on NH 334 B (Jhajjar-Charkhi Dadri Road) At… — forest land use approved, 2.1 km away
- Diversion of Forest Land for Construction of Open Drain for Dewatering of… — lapsed, 3 km away
- Pipe line along disty in Distt Charkhi Dadri — lapsed, 5 km away
- M/S Adani Total Gas LTD. (Formerly Known As M/S Adani Gas LTD.) on NH 334b… — lapsed, 6.4 km away
- Diversion of Protected Forest Land Area for Upgradation of Jhajjar-Charkhi… — more information requested, 7.9 km away
- Diversion of forest land of 0.0931 hectare for development of our proposed… — forest land use approved, 9.4 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Charki Dadri
- Diversion of Forest Land (0.1265 Ha.) for Access to the Proposed Fuel Station… — lapsed
- Diversion of Forest Land (0.1136Hect.) for access to the Proposed Fuel Station… — lapsed
- Bpcl Retail Outlet on Nh-334b (Charkhi Dadri to Loharu Road ) at Design Ch-… — forest land use approved
- M/s Bharat Petroleum Corporation Ltd. along on SH 34 (Bond Kalan-Dadri Chirya-… — forest land use approved
- BPCL Retail outlet along Charkhi Dadri to Loharu Road on NH-334B Khewat No.… — forest land use approved
- Bpcl Retail Outlet at SH - 17 Km 4.910 ( L H S ) on Charkhidadri T O… — forest land use approved
10 Bharat Petroleum Corporation (BPCL) projects in Charki Dadri
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.