Quick answers
What is Fuel station by Bharat Petroleum Corporation Limited?
This lapsed fuel station by Bharat Petroleum Corporation Limited is in Naryala, Ballabgarh, Faridabad, Haryana. The site covers 0.1 acres.
Who is building it?
The applicant is Raj Shri.
Has it been approved?
No. The application was lapsed on 2 Oct 2023, so it is no longer under consideration.
Where is it?
In Naryala, Ballabgarh, Faridabad, Haryana.
How big is it?
It has a stated cost of ₹3 lakh; a site of 0.1 acres and 510 m² of forest land.
When was it filed?
The application was filed on 29 Apr 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Oct 2023 |
| Application filed | 29 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Raj Shri |
| Land area | 500 m² |
| Forest land | 510 m² |
| Project cost | ₹3 lakh |
| Village / locality | Naryala |
| Taluk / tehsil | Ballabgarh |
| District | Faridabad |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04745 |
In context
22 applications in Faridabad since January 2022 are in the same category (Fuel stations): 5 approved, 2 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naryala, Ballabgarh, Faridabad, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail Outlet of M/S Hindustan Ptroleum Corporation Limited at Km 03.830, Lhs… — lapsed, 2.1 km away
- Diversion of Forest Land for Establish a Retail Outlet of Hpcl on Mohna to… — lapsed, 3.3 km away
- Diversion of Forest Land for Establish a Retail Outlet of Hpcl on Mohna to… — lapsed, 3.3 km away
- Proposed Retail Outlet of Bharat Petroleum Corporation Limited abutting on… — lapsed, 3.5 km away
- Proposed Bpcl Retail Outlet on Ballabgarh- Chhainsa-Mohna Road (Link Road… — lapsed, 3.6 km away
- Diversion of Forest Land for approach access to Proposed Site of Retail Outlet… — lapsed, 3.8 km away
- Proposed Expansion of Civil Construction of Industrial Building for Scrap… — environmental approval granted, 4 km away
- Regularisation of existing production facility of 18,300 TPA Rolling Mill — not approved, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.