Diversion of forest land for approach access to Proposed Site for Setting up Industrial Unit - M/s Aarjavam Techfab Private Limited (Packing Materials Manufacturing from Non-Asbestos Fiber)

Diversion of forest land for approach access to Proposed Site for Setting up Industrial Unit - M/s Aarjavam Techfab Private Limited (Packing Materials Manufacturing from Non-Asbestos Fiber) is a lapsed building project in Chhatera Bahadurpur, Sonipat, Haryana. The site covers 4.7 acres. Its stated project cost is ₹2.5 crore. As of 27 Nov 2026, its status is “Lapsed” (since 28 May 2025).

See it on the live map All projects in Sonipat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land for approach access to Proposed Site for Setting up Industrial Unit - M/s Aarjavam Techfab Private Limited (Packing Materials Manufacturing from Non-Asbestos Fiber) is a lapsed building project in Chhatera Bahadurpur, Sonipat, Haryana. The site covers 4.7 acres.

Who is building it?

The applicant is Aarjavam Techfab Private Limited.

Has it been approved?

No. The application was lapsed on 28 May 2025, so it is no longer under consideration.

Where is it?

In Chhatera Bahadurpur, Sonipat, Haryana.

How big is it?

It has a stated cost of ₹2.5 crore; a site of 4.7 acres and 150 m² of forest land.

When was it filed?

The application was filed on 17 Dec 2024.

Project details

Official titleDiversion of forest land for approach access to Proposed Site for Setting up Industrial Unit - M/s Aarjavam Techfab Private Limited (Packing Materials Manufacturing from Non-Asbestos Fiber) in the Revenue Estate of Village Chhatera Bahadurpur, Tehsil & District Sonipat (HR)
StatusLapsed
Status since28 May 2025
Application filed17 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantAarjavam Techfab Private Limited
Land area4.7 acres (1.9 ha)
Forest land150 m²
Project cost₹2.5 crore
Village / localityChhatera Bahadurpur
Taluk / tehsilSonipat
DistrictSonipat
StateHaryana
Location fromSite boundary on record
Our referenceWID-HR-04788

In context

95 applications in Sonipat since January 2022 are in the same category (Buildings & townships): 26 approved, 13 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.7 acres, this one is smaller than 63% of them.

33 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chhatera Bahadurpur, Sonipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.