One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of Existing Formaldehyde Manufacturing Unit capacity from 40 MT/day…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 22 Oct 2026 |
| Application filed | 16 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | R S Chemicals |
| Land area | 3,900 m² |
| Project cost | ₹6 crore |
| Village / locality | Kanjel Jattan |
| Taluk / tehsil | Jagadhri |
| District | Yamunanagar |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04925 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 16 Nov 2026 (this page) | Under environmental review | 1 acre | ₹6 crore |
| Early planning filed 28 Mar 2024 | Cleared for impact study | 1 acre | ₹6 crore |
In context
77 applications in Yamunanagar since January 2022 are in the same category (Industry): 12 approved, 16 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1 acre, this one is smaller than 82% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanjel Jattan, Jagadhri, Yamunanagar, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Formaldehyde Manufacturing Unit capacity from… — cleared for impact study, 50 m away
- Proposed Greenfield Project for Manufacturing of Resins by M/s Dormak Veneer… — lapsed, 2.3 km away
- Aggarwal Plywood Industries — lapsed, 2.7 km away
- Alloy Steel & Casting — lapsed, 2.7 km away
- Resin Manufacturing Unit Within the Existing Plywood Manufacturing industry of… — lapsed, 2.8 km away
- Diversion of Forest Land of 0.0063Ha. for access to Automobile Manufacturing… — lapsed, 3.2 km away
- Industrial project by Yamuna Nagar Engineering Cluster Pvt. Ltd. — initial checks, 3.2 km away
- Industrial project by Yamuna Nagar Engineering Cluster Pvt. Ltd. — lapsed, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.