Project details
| Official title | Installation of a 120 KTA Maleic Anhydride (MAH) and 40 KTA 1,4-Butanediol (BDO) / Tetra Hydrofuran (THF) plant at Panipat Naphtha Cracker Complex |
|---|---|
| Status | Under environmental review |
| Status since | 20 Nov 2026 |
| Application filed | 27 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 94.6 acres (38.3 ha) |
| Project cost | ₹5,513.5 crore |
| Village / locality | Bal Jatan |
| Taluk / tehsil | Panipat |
| District | Panipat |
| State | Haryana |
| Location from | Site boundary on record |
| Our reference | WID-HR-04932 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Oct 2026 (this page) | Under environmental review | 94.6 acres | ₹5,513.5 crore |
| New project filed 8 Jul 2025 | Returned to applicant | 94.6 acres | ₹5,513.5 crore |
| New project filed 12 Mar 2025 | Returned to applicant | 94.6 acres | ₹5,513.5 crore |
In context
83 applications in Panipat since January 2022 are in the same category (Industry): 21 approved, 22 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 94.6 acres, this one is larger than 94% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bal Jatan, Panipat, Haryana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 120 KTA Maleic Anhydride (MAH) and 40 KTA 1,4-Butanediol (BDO) / Tetra… — returned to applicant, 0 m away
- 120 KTA Maleic Anhydride (MAH) and 40 KTA 1,4-Butanediol (BDO) / Tetra… — returned to applicant, 0 m away
- Capacity Expansion of Naphtha Cracker Unit Phase-II (NCU-II), Capacity… — withdrawn, 700 m away
- Capacity Expansion of Naphtha Cracker Unit Phase-II (NCU-II), Capacity… — returned to applicant, 700 m away
- Expansion by Installation of a 60 KTA Poly-Butadiene Rubber (PBR)plant at… — environmental approval granted, 800 m away
- Setting up 86.8 TMTPA Sustainable Aviation Fuel (SAF) Plant at Panipat… — returned to applicant, 1.3 km away
- Diversion of forest land of 0.4202Ha. for creation of 33 KV Thirana line from… — lapsed, 1.4 km away
- 33 KV Thirana Line from 132 KV Sub Station HSIIDC Panipat — lapsed, 2.3 km away
More from Indian Oil Corporation Limited (IOCL) in Panipat
- Capacity Expansion of Naphtha Cracker Unit Phase-II (NCU-II), Capacity… — withdrawn
- Capacity Expansion of Naphtha Cracker Unit Phase-II (NCU-II), Capacity… — returned to applicant
- Setting up 86.8 TMTPA Sustainable Aviation Fuel (SAF) Plant at Panipat… — returned to applicant
13 Indian Oil Corporation (IOCL) projects in Panipat
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.