Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 14 Jun 2023 |
| Application filed | 14 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Rajiv Drolia |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹45 crore |
| Village / locality | Kathar Gonda |
| Taluk / tehsil | Ranchi |
| District | Ranchi |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00087 |
What the filings say
What is planned
Sky Deck 72 is a proposed residential and commercial development by Rajiv Drolia, Pushpa Devi Drolia, and Drolia Mineral Industries (P) Ltd. The project involves the construction of two distinct blocks on a 0.45-hectare (1.11-acre) plot.
The residential component consists of a single building with two basements, a ground floor, 25 upper floors, and a terrace (B1+B2+G+25+Terrace). This block will house 24 dwelling units. The commercial component is a separate building comprising a basement, lower ground floor, ground floor, four upper floors, and a terrace (B+LG+G+4+Terrace). It is designed to accommodate 29 shops and two offices.
The total built-up area for the project is approximately 23,290.22 square metres. The tallest building will reach a height of 89.90 metres. The project is estimated to serve a total population of 808 people, including 168 residents, 614 commercial staff, and 26 support staff and visitors.
Layout and design
The site layout includes internal roads with a width of 5 metres, pedestrian pathways, and dedicated ramps for vehicle access. A 6-metre wide two-way ramp will lead down to the basements for residential use, while a separate 6-metre wide ramp is planned for commercial access.
Parking facilities are designed for 186 vehicles. The residential block will have 69 car spaces and 64 two-wheeler spaces across the basement, lower ground, and ground floors. The commercial block will provide 23 car spaces and 30 two-wheeler spaces in its basement.
| Item | Detail |
|---|---|
| Total Plot Area | 4,493 sq.m (0.45 ha) |
| Ground Coverage | 1,473.22 sq.m (32.78%) |
| Total Built-up Area | 23,290.22 sq.m |
| Total Green Area | 1,347.9 sq.m |
| Maximum Height | 89.90 m |
| Total Parking | 186 units |
| Estimated Population | 808 persons |
Land and surroundings
The project is located at Khata no. 121, Plot no. 759 in Village Kathar Gonda, Ranchi. The site is flat land with an average elevation of 657 metres above mean sea level. It is situated opposite Krishi Bhawan on Kanke Road.
Nearby landmarks include SS Memorial College (0.18 km), Kanke Dam (0.65 km), and Indrapuri Colony (0.80 km). The site is adjacent to the Kanke-Patratu Road on its western side and is approximately 5.52 km from the Ranchi Junction railway station.
Water, power and access
During the operation phase, the total water requirement is estimated at 63 kilolitres per day (KLD). Fresh water demand of 24 KLD will be met through municipal supply. The remaining 39 KLD will be sourced from recycled water treated on-site.
A Sewage Treatment Plant (STP) with a capacity of 60 KLD (two units of 30 KLD each) using Sequencing Batch Reactor (SBR) technology is proposed. Treated water will be reused for flushing (28 KLD), landscaping (8 KLD), fire fighting, and cooling systems.
Storm water will be managed through three rainwater harvesting pits. The applicant proposes to collect up to 52 cubic metres of rooftop runoff daily during the monsoon to supplement potable needs.
Maximum power demand is estimated at 1,055 kVA, to be supplied by the Jharkhand State Electricity Board. For backup, two diesel generator sets with a combined capacity of 275 kVA (one 125 kVA for commercial and one 150 kVA for residential) will be installed.
Environmental safeguards
The project includes a total green area of 1,347.9 square metres, representing approximately 30% of the plot area (10% as a ground-level green belt and 20% on terraces and compound areas). Proposed tree species include Neem, Ashok, Arjun, and Gulmohar.
Solid waste generation during the operation phase is estimated at 249 kg per day. This includes 200 kg of recyclable waste and 49 kg of non-recyclable waste. Organic waste will be converted to manure for landscaping. Construction waste, estimated at 13,719 cubic metres of muck, will be reused on-site for leveling or disposed of through authorized vendors.
Residential and Commercial Project Sky Deck 72 site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
78 applications in Ranchi since January 2022 are in the same category (Buildings & townships): 67 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.1 acres, this one is smaller than 99% of them.
21 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathar Gonda, Ranchi, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Residential Group Housing Project of M/s Oceanik Buildtech and… — environmental approval granted, 2.2 km away
- Residential Group Housing Project by Harshita Srivastava — environmental approval granted, 2.2 km away
- Proposed Residential Cum Commercial Complex "Faii Residency" — environmental approval granted, 2.2 km away
- Proposed Commercial cum Residential Building Project "Essence Mall (Previously… — environmental approval granted, 2.9 km away
- Proposed Commercial Cum Residential "Eminence Mall" & Hospital Project — environmental approval granted, 2.9 km away
- 62, Circular Road Complex — environmental approval granted, 3.1 km away
- Proposed Residential Project "KB Tower" — environmental approval granted, 3.2 km away
- Residential Housing Complex Shri Vrinda Green Phase -III — withdrawn, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.