One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Enhancing the Production of Angle, Flat, Etc. From 13500 Tpa…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Renuka Ispat Private Limited |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹50 crore |
| Village / locality | Saldaha |
| Taluk / tehsil | Baghmara-Cum-Katras |
| District | Dhanbad |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00149 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 3.3 acres | ₹50 crore |
| Expansion filed 8 Oct 2023 | Environmental approval granted | 3.3 acres | ₹50 crore |
In context
13 applications in Dhanbad since January 2022 are in the same category (Industry): 10 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. At 3.3 acres, this one is smaller than 92% of them.
Where it is
Saldaha, Baghmara-Cum-Katras, Dhanbad, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Enhancing the Production of Angle, Flat, Etc. From… — environmental approval granted, 0 m away
- Kharani Stone Deposit (Area: 2.108 Ha. or 5.21 Acres) — environmental approval granted, 5.9 km away
- Laxmanpur Stone Deposit ( 1.448 ha) — environmental approval granted, 6.1 km away
- Khurdih Stone Deposit — environmental approval granted, 6.3 km away
- Khurdih Stone Deposit (2.17 Hectares) — environmental approval granted, 6.4 km away
- Nepaidih & Brahmandiha Stone Deposit — environmental approval granted, 6.9 km away
- Brahmandiha Stone Deposit (1.36 ha.) — environmental approval granted, 6.9 km away
- Sijua Colliery of Tata Steel Limited for expansion in production capacity to… — under environmental review, 9.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.