What is this project?
Expansion of Existing Sponge Iron Unit from 120,000 TPA to 480,000 TPA, Installation of 6x20 Ton IF, 2x20 Ton LRF, 1x3 strand 6/11m CCM for production of 360,000 TPA MS Billets, Installation of 750 TPD Rolling Mill for production of 225000 TPA TMT Bar, Captive Power Plant of 58 MW and 37,000 TPA Slag Crushing Plant by Aloke Steel Industries Pvt Ltd is a proposed industrial project in Burhakhap, Mandu, Ramgarh, Jharkhand. The site covers 52.3 acres.
Who is building it?
The applicant is Aloke Steels Industries Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Jan 2024), as of 27 Nov 2026.
Where is it?
In Burhakhap, Mandu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹912 crore and a site of 52.3 acres.
When was it filed?
The application was filed on 20 Nov 2023.
Project details
| Official title | Expansion of Existing Sponge Iron Unit from 120,000 TPA to 480,000 TPA, Installation of 6x20 Ton IF, 2x20 Ton LRF, 1x3 strand 6/11m CCM for production of 360,000 TPA MS Billets, Installation of 750 TPD Rolling Mill for production of 225000 TPA TMT Bar, Captive Power Plant of 58 MW and 37,000 TPA Slag Crushing Plant at village: Budhakhap, District: Ramgarh, State Jharkhand by Aloke Steel Industries Pvt Ltd |
|---|---|
| Status | Cleared for impact study |
| Status since | 18 Jan 2024 |
| Application filed | 20 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Aloke Steels Industries Private Limited |
| Land area | 52.3 acres (21.2 ha) |
| Project cost | ₹912 crore |
| Village / locality | Burhakhap |
| Taluk / tehsil | Mandu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00151 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 31 Aug 2026 | Under environmental review | 45.2 acres | ₹912 crore |
| Other filed 14 Dec 2023 | Lapsed | 52.3 acres | ₹912 crore |
| Early planning filed 20 Nov 2023 (this page) | Cleared for impact study | 52.3 acres | ₹912 crore |
In context
30 applications in Ramgarh since January 2022 are in the same category (Industry): 12 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 52.3 acres, this one is larger than 60% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Burhakhap, Mandu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing 120000 TPA Sponge Iron for addition of SMS for… — environmental approval granted, 0 m away
- Expansion of Existing Sponge Iron Unit from 120,000 TPA to 480,000 TPA,… — lapsed, 0 m away
- Expansion of Existing Sponge Iron Unit from 120,000 TPA to 480,000 TPA,… — under environmental review, 50 m away
- Burakhap Small Patch Coal Mine — lapsed, 1.5 km away
- Burakhap Small Patch Coal Mine — cleared for impact study, 1.6 km away
- Painki Sand Deposit — environmental approval granted, 2.2 km away
- Painki Sand Ghat — environmental approval granted, 2.2 km away
- 25 MW CFBC BASED CAPTIVE THERMAL POWER PLANT M/s Radha Casting & Metalik Pvt.… — under environmental review, 2.4 km away
More from Aloke Steels Industries Private Limited in Ramgarh
- Expansion of existing 120000 TPA Sponge Iron for addition of SMS for… — environmental approval granted
All 4 Aloke Steels Industries projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.