Production of 1,71,748 Tpa Granite Gneiss Through Mechanised Opencast Mining Method With Maximum Excavation of 1,85,399.4 Tpa Spread Over 3.33 Acres (1.347 Ha.) in Mouza – Amainagar, Thana – Chandankiyari, Thana No. – 269, District – Bokaro , State Jharkhand

Production of 1,71,748 Tpa Granite Gneiss Through Mechanised Opencast Mining Method With Maximum Excavation of 1,85,399.4 Tpa Spread Over 3.33 Acres (1.347 Ha.) in Mouza – Amainagar, Thana – Chandankiyari, Thana No. – 269, District – Bokaro , State Jharkhand is an approved mining project in Amainagar, Chandankiyari, Bokaro, Jharkhand. The site covers 3.3 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 18 Sept 2023).

See it on the live map All projects in Bokaro

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Production of 1,71,748 Tpa Granite Gneiss Through Mechanised Opencast Mining Method With Maximum Excavation of 1,85,399.4 Tpa Spread Over 3.33 Acres (1.347 Ha.) in Mouza – Amainagar, Thana – Chandankiyari, Thana No. – 269, District – Bokaro , State Jharkhand is an approved mining project in Amainagar, Chandankiyari, Bokaro, Jharkhand. The site covers 3.3 acres.

Who is building it?

The applicant is Mohd Ansari.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 18 Sept 2023), as of 27 Nov 2026.

Where is it?

In Amainagar, Chandankiyari, Bokaro, Jharkhand.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 3.3 acres.

When was it filed?

The application was filed on 18 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since18 Sept 2023
Application filed18 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantMohd Ansari
Land area3.3 acres (1.4 ha)
Project cost₹1.1 crore
Village / localityAmainagar
Taluk / tehsilChandankiyari
DistrictBokaro
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00393

In context

93 applications in Bokaro since January 2022 are in the same category (Mining): 76 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 3.3 acres, this one is smaller than 86% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Amainagar, Chandankiyari, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.