Cleared for impact studyIndustry · Pashchimi Singhbhum, Jharkhand

Expansion of the existing 120,000TPA Sponge Iron Plant by installation of Iron Ore Beneficiation Plant 96000 TPA (Throughput), Captive Power Plant 12 MW (AFBC: 4MW & WHRB: 8MW) and installation of 1x9 MVA Submerged Arc Furnace for production of 16,200 TPA Silico Manganese by M/s Shri Balaji Industrial Engineering Ltd at Basti Road, P.O.: Barajamda, District: West Singhbhum, Jharkhand

Expansion of the existing 120,000TPA Sponge Iron Plant by installation of Iron Ore Beneficiation Plant 96000 TPA (Throughput), Captive Power Plant 12 MW (AFBC: 4MW & WHRB: 8MW) and installation of 1x9 MVA Submerged Arc Furnace for production of 16,200 TPA Silico Manganese by M/s Shri Balaji Industrial Engineering Ltd at Basti Road, P.O.: Barajamda, District: West Singhbhum, Jharkhand is a proposed industrial project in Bara Jamda, Noamundi, Pashchimi Singhbhum, Jharkhand. The site covers 16.6 acres. Its stated project cost is ₹163.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 9 Jul 2023).

See it on the live map All projects in Pashchimi Singhbhum

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of the existing 120,000TPA Sponge Iron Plant by installation of Iron Ore Beneficiation Plant 96000 TPA (Throughput), Captive Power Plant 12 MW (AFBC: 4MW & WHRB: 8MW) and installation of 1x9 MVA Submerged Arc Furnace for production of 16,200 TPA Silico Manganese by M/s Shri Balaji Industrial Engineering Ltd at Basti Road, P.O.: Barajamda, District: West Singhbhum, Jharkhand is a proposed industrial project in Bara Jamda, Noamundi, Pashchimi Singhbhum, Jharkhand. The site covers 16.6 acres.

Who is building it?

The applicant is Shri Balaji Industrial Engineering Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 9 Jul 2023), as of 27 Nov 2026.

Where is it?

In Bara Jamda, Noamundi, Pashchimi Singhbhum, Jharkhand.

How big is it?

It has a stated cost of ₹163.5 crore and a site of 16.6 acres.

When was it filed?

The application was filed on 10 Apr 2023.

Project details

StatusCleared for impact study
Status since9 Jul 2023
Application filed10 Apr 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantShri Balaji Industrial Engineering Limited
Land area16.6 acres (6.7 ha)
Project cost₹163.5 crore
Village / localityBara Jamda
Taluk / tehsilNoamundi
DistrictPashchimi Singhbhum
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00508

In context

7 applications in Pashchimi Singhbhum since January 2022 are in the same category (Industry): 3 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bara Jamda, Noamundi, Pashchimi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.