Quick answers
What is this project?
Expansion of Existing MS Ingot/Billet production from 13200 TPA to 118800 TPA through existing 2x8T Furnace & installing additional 2x10T Furnaces is a proposed industrial project in Bokaro Steel City, Chas, Bokaro, Jharkhand. The site covers 7.9 acres.
Who is building it?
The applicant is Mangalam Ispat.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bokaro Steel City, Chas, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹22.7 crore and a site of 7.9 acres.
When was it filed?
The application was filed on 23 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Existing MS Ingot/Billet production from 13200 TPA to 118800 TPA through…
Project details
| Official title | Expansion of Existing MS Ingot/Billet production from 13200 TPA to 118800 TPA through existing 2x8T Furnace & installing additional 2x10T Furnaces along with CCM-1x2strand, Rad- 4/7 and production of 29700 TPA to 117600 TPA by increasing Rolling Mill capacity to 1x20TPH located at Plot No. IV/A-5(P), Bokaro Industrial Area, Balidih, Bokaro, Jharkhand |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mangalam Ispat |
| Land area | 7.9 acres (3.2 ha) |
| Project cost | ₹22.7 crore |
| Village / locality | Bokaro Steel City |
| Taluk / tehsil | Chas |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00512 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 7.9 acres | ₹22.7 crore |
| Expansion filed 11 Oct 2023 | Environmental approval granted | 7.9 acres | ₹22.7 crore |
In context
27 applications in Bokaro since January 2022 are in the same category (Industry): 16 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.9 acres, this one is larger than 52% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bokaro Steel City, Chas, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing MS Ingot/Billet production from 13200 TPA to 118800 TPA… — environmental approval granted, 0 m away
- Greenfield Ferro Alloys Plant for production of 56,000 TPA (max.) Ferro Alloys… — environmental approval granted, 300 m away
- Greenfield Ferro Alloys Plant for production of 56,000 TPA (max.) Ferro Alloys… — cleared for impact study, 300 m away
- Transfer of Environment Clearance and its Corrigendum in EC from Castron… — lapsed, 350 m away
- Greenfield Ferro Alloys Plant for production of 40,000 TPA (Max.) Ferro Alloys… — cleared for impact study, 650 m away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — environmental approval granted, 800 m away
- Greenfield Ferro Alloys Plant for production of 31,000 TPA (max.) Ferro Alloys… — cleared for impact study, 800 m away
- Ferro Alloys Plant (Greenfield Project) for production of 32,400 TPA Ferro… — environmental approval granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.