Quick answers
What is this project?
Proposed mining of Brick Clay (Earth) from Kumbakera Brick Earth Deposit over an area of 3.44 Acres (1.39 ha.), at Khata No. 87 & 74; Plot No. 05, 06 & 20 at Mouza– Kumbakera, Thana No. – 126, District – Simdega, State-Jharkhand is an approved mining project in Kumbakera, Kolebira, Simdega, Jharkhand. The site covers 3.4 acres.
Who is building it?
The applicant is Sardhan Sahu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Oct 2023), as of 27 Nov 2026.
Where is it?
In Kumbakera, Kolebira, Simdega, Jharkhand.
How big is it?
It has a stated cost of ₹16 lakh and a site of 3.4 acres.
When was it filed?
The application was filed on 16 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Oct 2023 |
| Application filed | 16 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sardhan Sahu |
| Land area | 3.4 acres (1.4 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Kumbakera |
| Taluk / tehsil | Kolebira |
| District | Simdega |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00550 |
In context
28 applications in Simdega since January 2022 are in the same category (Mining): 22 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 3.4 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Kumbakera, Kolebira, Simdega, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tangratoli Stone Block — environmental approval granted, 1.9 km away
- Tangartoli - A Stone block — environmental approval granted, 2.1 km away
- Khadiya Stone Mine — environmental approval granted, 2.5 km away
- Barasloya Stone Mine — environmental approval granted, 8 km away
- Construction of Cold Storage at Kolebira — lapsed, 9.3 km away
- Sijang Stone Deposit — environmental approval granted, 12.4 km away
- Gobardhasa - B Stone Block — environmental approval granted, 14.6 km away
- Gobardhasa - A Stone Block — environmental approval granted, 14.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.