Production of 34,403 Tpa Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 35763 Tpa Spread Over 2.24 Acres (0.91 Ha.) is an approved mining project in Pichhri, Peterwar, Bokaro, Jharkhand. The site covers 2.2 acres.
Who is building it?
The applicant is Shribhagwan Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 May 2023), as of 27 Nov 2026.
Where is it?
In Pichhri, Peterwar, Bokaro, Jharkhand.
How big is it?
It has a stated cost of ₹1 crore and a site of 2.2 acres.
When was it filed?
The application was filed on 20 May 2023.
Project details
| Official title | Production of 34,403 Tpa Granite Gneiss Through Semi-Mechanised Opencast Mining Method With Maximum Excavation of 35763 Tpa Spread Over 2.24 Acres (0.91 Ha.) in Village Pichhri, P.S. Petarwar, District Bokaro, State Jharkhand for Pichhri Stone Deposit. |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 May 2023 |
| Application filed | 20 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shribhagwan Singh |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹1 crore |
| Village / locality | Pichhri |
| Taluk / tehsil | Peterwar |
| District | Bokaro |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00555 |
In context
93 applications in Bokaro since January 2022 are in the same category (Mining): 76 approved, 3 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 2.2 acres, this one is smaller than 93% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Pichhri, Peterwar, Bokaro, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tantri Stone Mine — lapsed, 250 m away
- Tantri Stone Mine — environmental approval granted, 250 m away
- Jugnu Stone Mine (2.83 Ha. or 7.00Acres) — environmental approval granted, 300 m away
- Angwali Opencast Project — lapsed, 2.5 km away
- Selected Dhori (Lower) Open Cast Mine — environmental approval granted, 2.6 km away
- Selected Dhori (Lower) Open Cast Mine — environmental approval granted, 2.6 km away
- Selected Dhori (Lower) Open Cast Mine — cleared for impact study, 2.6 km away
- Dhori Coking Coal Washery — cleared for impact study, 3.6 km away
More from Shribhagwan Singh in Bokaro
- Proposed Production of 94,180 Tpa Granite Gneiss Through Mechanised Opencast… — environmental approval granted
About this information