Project details
| Official title | Proposed project for Enhancement of MS Billet Production From 15,000 TPA to 148,500 TPA through 3x15T Induction Furnaces (by Replacing existing 1x6 T furnace with 1x15T & Installing additional 2x15T Furnaces along with CCM-2X2 Strand, Slag Crusher from 2400 TPA to 30,000 TPA capacity and TMT Bars & Rolled Products from 13,500 TPA To 144,210 TPA By Modernization of Existing Rolling Mill from 1x5TPH to 1x25 TPH Capacity along with Electroplating Unit of 20 TPD by M/s Tulshyan Metals Private Limite |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 May 2024 |
| Application filed | 24 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Tulshyan Metals Private Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹43 crore |
| Village / locality | Jhumri Tilaiya |
| Taluk / tehsil | Koderma |
| District | Kodarma |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00720 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 24 Apr 2024 (this page) | Environmental approval granted | 2.7 acres | ₹43 crore |
| Early planning filed 14 Aug 2023 | Cleared for impact study | 2.7 acres | ₹43 crore |
In context
17 applications in Kodarma since January 2022 are in the same category (Industry): 14 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 88% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jhumri Tilaiya, Koderma, Kodarma, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project for Enhancement of MS Billet Production From 15,000 TPA to… — cleared for impact study, 0 m away
- Greenfield 100,000 TPA Coal Tar Distillation Plant for production of 54,000… — environmental approval granted, 500 m away
- Greenfield 100,000 TPA Coal Tar Distillation Plant for production of 54,000… — cleared for impact study, 500 m away
- PROPOSED PRODUCTION CAPACITY OF THE M.S. BILLETS IS ~500 MT/DAY (1,50,000 TPA)… — environmental approval granted, 600 m away
- 132 KV D/C From KTPS GSS to Gajhandi TSS Transmission Line — more information requested, 700 m away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — cleared for impact study, 700 m away
- Environmental Clearance of Proposed production capacity 2,64,000 TPA of MS… — environmental approval granted, 700 m away
- 132 KV D/C KTPS GSS to Gujhandi TSS — lapsed, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.