One of 2 filings for this project. The project's main page, with every filing and where each stands: Demba Stone Mine
Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 Dec 2024 |
| Application filed | 27 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mahaveer Engicons Private Limited |
| Land area | 24.9 acres (10.1 ha) |
| Project cost | ₹11 lakh |
| Village / locality | Demba |
| Taluk / tehsil | Mandro |
| District | Sahibganj |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00799 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 13 Aug 2025 | Environmental approval granted | 7.7 acres | ₹1.2 crore |
| New project filed 27 Dec 2024 (this page) | Withdrawn | 24.9 acres | ₹11 lakh |
In context
282 applications in Sahibganj since January 2022 are in the same category (Mining): 201 approved, 23 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.9 acres, this one is larger than 99% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 36.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Demba, Mandro, Sahibganj, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- DEMBA STONE MINE (4.84 Ha) — environmental approval granted, 50 m away
- DEMBA STONE MINE (4.84 Ha) — environmental approval granted, 50 m away
- DEMBA STONE MINE (4.84 Ha) — cleared for impact study, 50 m away
- Demba Stone Mine — environmental approval granted, 450 m away
- Demba Stone Deposit — environmental approval granted, 700 m away
- Demba Stone Deposit — cleared for impact study, 700 m away
- Demba Stone Deposit — withdrawn, 700 m away
- Demba Stone Deposit — lapsed, 700 m away
More from Mahaveer Engicons Private Limited in Sahibganj
- Chuwa Stone Deposit-Ii — lapsed
- Chuwa Stone Deposit-I — environmental approval granted
- DEMBA STONE MINE (4.84 Ha) — environmental approval granted
- DEMBA STONE MINE (4.84 Ha) — environmental approval granted
- Chuwa Stone Deposit-Ii — cleared for impact study
- DEMBA STONE MINE (4.84 Ha) — cleared for impact study
All 11 Mahaveer Engicons projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.