Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Dec 2024 |
| Application filed | 21 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shakeel Ansari |
| Land area | 2.1 acres (0.8 ha) |
| Project cost | ₹16 lakh |
| Village / locality | Soranda |
| Taluk / tehsil | Bhandra |
| District | Lohardaga |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-00881 |
In context
83 applications in Lohardaga since January 2022 are in the same category (Mining): 55 approved, 1 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.1 acres, this one is smaller than 64% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Soranda, Bhandra, Lohardaga, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick soil mining for M/s M.K.Bricks — lapsed, 1.5 km away
- Brick Soil Mining For M/s M.K. bricks — lapsed, 1.5 km away
- Brick Soil Mining For M/s M. K. Bricks — lapsed, 1.5 km away
- Burka Brick Clay Deposit — environmental approval granted, 5.9 km away
- Jhaljamira Stone Block — environmental approval granted, 9.8 km away
- Jhaljamira Stone Block - A — environmental approval granted, 10.1 km away
- Tigra Brick Clay Mine — environmental approval granted, 10.8 km away
- Harmu - Bhakso Sand Deposit — cleared for impact study, 13.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.