Cleared for impact studyIndustry · Pashchimi Singhbhum, Jharkhand

Expansion of Cement Plant: Cement - 1.2 MTPA to 7.2 MTPA (by installation of new lines of 2 x 3.0 MTPA) with no change in existing Clinker Production Capacity of 1.2 MTPA and CPP of 20 MW within existing Plant Premises at Villages - Jorapokhar, Basahatu, Kudahatu, Rajanka, Tehsil - Chaibasa, District – Pashchimi Singhbhum, Jharkhand by ACC Ltd. (Chaibasa Cement Works)

Expansion of Cement Plant: Cement - 1.2 MTPA to 7.2 MTPA (by installation of new lines of 2 x 3.0 MTPA) with no change in existing Clinker Production Capacity of 1.2 MTPA and CPP of 20 MW within existing Plant Premises at Villages - Jorapokhar, Basahatu, Kudahatu, Rajanka, Tehsil - Chaibasa, District – Pashchimi Singhbhum, Jharkhand by ACC Ltd. (Chaibasa Cement Works) is a proposed industrial project in Jorapokhar, Tonto, Pashchimi Singhbhum, Jharkhand. The site covers 214.5 acres. Its stated project cost is ₹1,952.4 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Jan 2025).

See it on the live map All projects in Pashchimi Singhbhum

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Cement Plant: Cement - 1.2 MTPA to 7.2 MTPA (by installation of new lines of 2 x 3.0 MTPA) with no change in existing Clinker Production Capacity of 1.2 MTPA and CPP of 20 MW within existing Plant Premises at Villages - Jorapokhar, Basahatu, Kudahatu, Rajanka, Tehsil - Chaibasa, District – Pashchimi Singhbhum, Jharkhand by ACC Ltd. (Chaibasa Cement Works) is a proposed industrial project in Jorapokhar, Tonto, Pashchimi Singhbhum, Jharkhand. The site covers 214.5 acres.

Who is building it?

The applicant is Acc Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Jan 2025), as of 27 Nov 2026.

Where is it?

In Jorapokhar, Tonto, Pashchimi Singhbhum, Jharkhand.

How big is it?

It has a stated cost of ₹1,952.4 crore and a site of 214.5 acres.

When was it filed?

The application was filed on 10 Jan 2025.

Project details

StatusCleared for impact study
Status since13 Jan 2025
Application filed10 Jan 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAcc Limited
Land area214.5 acres (86.8 ha)
Project cost₹1,952.4 crore
Village / localityJorapokhar
Taluk / tehsilTonto
DistrictPashchimi Singhbhum
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-00997

In context

7 applications in Pashchimi Singhbhum since January 2022 are in the same category (Industry): 3 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.

Where it is

Jorapokhar, Tonto, Pashchimi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 24 Acc projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.