Quick answers
What is this project?
Naridumri Stone Mine for production of 3,44,679 TPA Granite Gneiss through mechanised opencast mining method spread over 6.04 AC (2.44 Ha.) by M/s Mahalaxmi Minerals is an approved mining project in Naridumri, Deoghar, Jharkhand. The site covers 6 acres.
Who is building it?
The applicant is Ragini kumari.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jul 2025), as of 27 Nov 2026.
Where is it?
In Naridumri, Deoghar, Jharkhand.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 6 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Official title | Naridumri Stone Mine for production of 3,44,679 TPA Granite Gneiss through mechanised opencast mining method spread over 6.04 AC (2.44 Ha.) at village- Naridumri, Thana No. Jasidih, District- Deoghar, Jharkhand by M/s Mahalaxmi Minerals. |
|---|---|
| Status | Environmental approval granted |
| Status since | 8 Jul 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ragini kumari |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Naridumri |
| Taluk / tehsil | Deoghar |
| District | Deoghar |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01141 |
In context
74 applications in Deoghar since January 2022 are in the same category (Mining): 65 approved, 0 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Naridumri, Deoghar, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ukharia Stone Deposit — environmental approval granted, 2 km away
- Chapariya Stone Deposit (Area 6.50 Acres or 2.630 Ha). — environmental approval granted, 4.2 km away
- Augmentation and Strengthening of Deoghar Water Supply Scheme Under Deoghar… — in-principle approval, conditions pending, 5.2 km away
- Basatpur & Maljhar Sand Deposit — environmental approval granted, 7.7 km away
- Proposed Nano-Fertilizer (Nano DAP/Nano Urea/Super Nano Urea/Super Nano Urea… — environmental approval granted, 8.8 km away
- Proposed Nano-Fertilizer (Nano DAP/Nano Urea/Super Nano Urea/Super Nano Urea… — cleared for impact study, 8.8 km away
- Proposed Nano-Fertilizer (Nano DAP/Nano Urea/Super Nano Urea/Super Nano Urea… — cleared for impact study, 8.8 km away
- Proposed Nano Fertilizer (Nano Urea/Nano DAP) Manufacturing Plant — cleared for impact study, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.