One of 2 filings for this project. The project's main page, with every filing and where each stands: "Stone Mining" Project of Keshka Stone Block at Mouza- Keshka, Khata No (old) - 40 &…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 14 Jan 2025 |
| Application filed | 14 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pramod Kumar Singh |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Keshka |
| Taluk / tehsil | Tundi |
| District | Dhanbad |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01267 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Jan 2025 | Withdrawn | 2.8 acres | ₹68 lakh |
| New project filed 14 Jan 2025 (this page) | Withdrawn | 2.8 acres | ₹68 lakh |
In context
84 applications in Dhanbad since January 2022 are in the same category (Mining): 67 approved, 5 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.8 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Keshka, Tundi, Dhanbad, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Keshka Stone Block — environmental approval granted, 0 m away
- "Stone Mining" Project of Keshka Stone Block at Mouza- Keshka, Khata No (old)… — withdrawn, 0 m away
- Kadaiya Stone Deposit (2.306 ha.) — environmental approval granted, 1.9 km away
- Sahraj Stone Deposit — environmental approval granted, 6.1 km away
- Bd Alloys & Metals — lapsed, 8.2 km away
- Pipratand Stone Deposit Area-1.942 Ha. or 4.80 Acre — environmental approval granted, 8.4 km away
- "Stone Mining" Project of Marro Stone Block-C at Mouza- Marro, Khata No.- 20,… — cleared for impact study, 8.6 km away
- Marro Stone Deposit — environmental approval granted, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.