One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 6.0 Million…
Project details
| Official title | Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of 6.0 Million TPA within existing premises of Thermal Power Plant to meet 100% Fly Ash Utilization at Village: Motia, District: Godda, State: Jharkhand by Adani Power (Jharkhand) Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Jun 2025 |
| Application filed | 19 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Adani Power Limited |
| Land area | 570.7 acres (231 ha) |
| Project cost | ₹1,400 crore |
| Village / locality | Gangta |
| Taluk / tehsil | Godda |
| District | Godda |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01296 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 19 Sept 2025 | Cleared for impact study | 570.7 acres | ₹1,400 crore |
| Early planning filed 19 May 2025 (this page) | Cleared for impact study | 570.7 acres | ₹1,400 crore |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangta, Godda, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — cleared for impact study, 0 m away
- Amendment in Environmental Clearance of 2x800 MW Coal Based Godda Thermal… — environmental approval granted, 0 m away
- Change in Name (Transfer of EC) subsequently to NCLT Order from Adani Power… — environmental approval granted, 0 m away
- Transfer of EC (Change in Name) subsequently to NCLT Order from Adani Power… — environmental approval granted, 950 m away
- INTEGRATED MUNICIPAL SOLID WASTE MANAGEMENT PROCESSING FACILITY, M/s GODDA… — not approved, 5.9 km away
- Godda College Godda — under forest review, 6.8 km away
- Godda College Godda — lapsed, 6.8 km away
- Dhodri Sand Ghat — environmental approval granted, 8.2 km away
More from Adani Power Limited in Godda
- Transfer of EC (Change in Name) subsequently to NCLT Order from Adani Power… — environmental approval granted
- Change in Name (Transfer of EC) subsequently to NCLT Order from Adani Power… — environmental approval granted
- Amendment in Environmental Clearance of 2x800 MW Coal Based Godda Thermal… — environmental approval granted
5 Adani Power projects in Godda
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.