Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Oct 2025 |
| Application filed | 5 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dinesh Kumar Choudhary |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Banadag |
| Taluk / tehsil | Angara |
| District | Ranchi |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01334 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Sept 2025 (this page) | Environmental approval granted | 2 acres | ₹60 lakh |
| New project filed 5 Sept 2025 | Withdrawn | 2 acres | ₹60 lakh |
In context
78 applications in Ranchi since January 2022 are in the same category (Mining): 63 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 2 acres, this one is smaller than 90% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Banadag, Angara, Ranchi, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Banadag Stone Deposit — withdrawn, 0 m away
- 132 kv d/c Angada - Irba Transmission line — more information requested, 4.8 km away
- NAWAGARH STONE DEPOSIT (2.47 ha.) — environmental approval granted, 4.9 km away
- 100MW Floating Solar PV Plant at the reservoir of Getalsud Dam Ranchi — lapsed, 5.3 km away
- Badri Stone Deposit — environmental approval granted, 6 km away
- Kuchu Stone Deposit — environmental approval granted, 7.4 km away
- Gurgain Stone Mine — environmental approval granted, 7.8 km away
- Kuchu Stone Mine — under environmental review, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.