Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 May 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Agrani Iron and Power Private Limited |
| Land area | 109 acres (44.1 ha) |
| Project cost | ₹1,454 crore |
| Village / locality | Banuadih |
| Taluk / tehsil | Silli |
| District | Ranchi |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-01373 |
Where it is
Banuadih, Silli, Ranchi, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tati Stone Deposit — environmental approval granted, 12.2 km away
- Sundil Sand Deposit — environmental approval granted, 12.3 km away
- Sundil Sand Deposit — environmental approval granted, 12.3 km away
- 132 KV Angara Silli Transmission Line — lapsed, 14 km away
- Chokesereng Sand Deposit — environmental approval granted, 14.5 km away
- Chokesereng Sand Deposit (River Bed of Subarnarekha) of area 8.64 Acres /3.50… — environmental approval granted, 14.5 km away
- Chokesereng Sand Deposit (Area 3.50Ha) — not approved, 14.5 km away
- SINGARI STONE DEPOSIT (Area 1.06 Ha.) — environmental approval granted, 15.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.