What is Developing? Open the mapMap

LapsedIndustry · Purbi Singhbhum, Jharkhand

Integrated Steel Plant and 250 MW Captive Power Plant, Railway Siding by M/s. Specialsmelt Industries Private Limited

Integrated Steel Plant and 250 MW Captive Power Plant, Railway Siding by M/s. Specialsmelt Industries Private Limited is a lapsed industrial project in Gadrashol, Chakulia, Purbi Singhbhum, Jharkhand. The site covers 187.7 acres. Its stated project cost is ₹3,776.8 crore. As of 27 Nov 2026, its status is “Lapsed” (since 1 Aug 2025).

See it on the live map All projects in Purbi Singhbhum

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Integrated Steel Plant and 250 MW Captive Power Plant, Railway Siding by M/s. Specialsmelt Industries Private Limited is a lapsed industrial project in Gadrashol, Chakulia, Purbi Singhbhum, Jharkhand. The site covers 187.7 acres.

Who is building it?

The applicant is Voltox Rail Private Limited.

Has it been approved?

No. The application was lapsed on 1 Aug 2025, so it is no longer under consideration.

Where is it?

In Gadrashol, Chakulia, Purbi Singhbhum, Jharkhand.

How big is it?

It has a stated cost of ₹3,776.8 crore and a site of 187.7 acres.

When was it filed?

The application was filed on 30 Jun 2025.

Project details

Official titleProposed Installation of Integrated Steel Plant and 250 MW Captive Power Plant, Railway Siding at Village: Kaliyam, Gudrashol, Chatradoba, P.O. & P.S - Chakulia, (Near - Kokpara Railway Station), Dist- Singhbhum (East), Jharkhand – 832 302 by M/s. Specialsmelt Industries Private Limited
StatusLapsed
Status since1 Aug 2025
Application filed30 Jun 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantVoltox Rail Private Limited
Land area187.7 acres (76 ha)
Project cost₹3,776.8 crore
Village / localityGadrashol
Taluk / tehsilChakulia
DistrictPurbi Singhbhum
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-01628

In context

25 applications in Purbi Singhbhum since January 2022 are in the same category (Industry): 17 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 187.7 acres, this one is larger than 88% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gadrashol, Chakulia, Purbi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.