Quick answers
What is this project?
Road from Pachwara South Coal Block of M/s Neyveli Uttar Pradesh Power Ltd to the existing Sahebgunj-Govindpur Highway is a lapsed road project in Chirudih, Gopikandar, Dumka, Jharkhand. The site covers 215.4 acres.
Who is building it?
The applicant is Neyveli Uttar Pradesh Power Limited.
Has it been approved?
No. The application was lapsed on 2 Aug 2026, so it is no longer under consideration.
Where is it?
In Chirudih, Gopikandar, Dumka, Jharkhand.
How big is it?
It has a stated cost of ₹15 crore; a site of 215.4 acres and 12.2 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 23 Jan 2025.
Project details
| Official title | Construction of Road from Pachwara South Coal Block of M/s Neyveli Uttar Pradesh Power Ltd to the existing Sahebgunj-Govindpur Highway |
|---|---|
| Status | Lapsed |
| Status since | 2 Aug 2026 |
| Application filed | 23 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Neyveli Uttar Pradesh Power Limited |
| Land area | 215.4 acres (87.2 ha) |
| Forest land | 12.2 acres (4.9 ha) |
| Project cost | ₹15 crore |
| Village / locality | Chirudih |
| Taluk / tehsil | Gopikandar |
| District | Dumka |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02356 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chirudih, Gopikandar, Dumka, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Causeway Bridge from Pachwara South Opencast Project of M/s Neyveli Uttar… — initial checks, 3.5 km away
- Amendment of certain specific conditions of Environmental Clearance accorded… — environmental approval granted, 3.8 km away
- Lakhibad Stone Deposit Project of M/S Varun Singh Sisodia Pvt. Ltd. — environmental approval granted, 5.6 km away
- Chhatarchua Stone Mine — environmental approval granted, 5.9 km away
- Rambani Stone mine — environmental approval granted, 6.1 km away
- M/S Tridev Engicon Pvt. Ltd. (Rambani Stone Mine) — environmental approval granted, 6.3 km away
- Rambani Stone Mine — cleared for impact study, 6.4 km away
- Chhatarchua Stone Mine — environmental approval granted, 6.6 km away
More from Neyveli Uttar Pradesh Power Limited in Dumka
- Causeway Bridge from Pachwara South Opencast Project of M/s Neyveli Uttar… — initial checks
- Amendment of certain specific conditions of Environmental Clearance accorded… — environmental approval granted
3 Neyveli Uttar Pradesh Power projects in Dumka
All 5 Neyveli Uttar Pradesh Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.