Project details
| Status | More information requested |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 3 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Rcr Steel Works Private Limited |
| Land area | 112 acres (45.3 ha) |
| Forest land | 327.7 acres (132.6 ha) |
| Project cost | ₹352.8 crore |
| Village / locality | Binja |
| Taluk / tehsil | Burmu |
| District | Ranchi |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02413 |
In context
78 applications in Ranchi since January 2022 are in the same category (Mining): 63 approved, 7 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 112 acres, this one is larger than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 116.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Binja, Burmu, Ranchi, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Patal East (Eastern Part) underground Coal Mine, South Karanpura Coal Field,… — cleared for impact study, 200 m away
- Binja Coal Mine — initial checks, 1.8 km away
- Umedanda Stone Deposit — environmental approval granted, 4.2 km away
- Churi Benti UG Mine — cleared for impact study, 17.3 km away
- GURGAIN BRICK CLAY DEPOSIT (1.278 ha.) — environmental approval granted, 19.3 km away
- Coal Washery (5 MTPA of raw coal) of M/s MDCWL Limited located near KDH Mines… — under environmental review, 20 km away
- Coal Washery (5 MTPA of raw coal) of M/s MDCWL Limited located near KDH Mines… — environmental approval granted, 20 km away
- New Line and Modification of Existing Line at KDH Siding — under forest review, 20.6 km away
More from Rcr Steel Works Private Limited in Ranchi
- Patal East (Eastern Part) underground Coal Mine, South Karanpura Coal Field,… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.