33 KV line for supply of 2 MVA power at 33kV level to KBP Mining Pvt. Ltd. from Loc.No. 85 (Tapping Point) of Existing 33kV CCL- Kedla Double Circuit Line to KBPOCP Sub station at Vill: Basantpur, Khata No. 14, Plot No. 99P, Anchal: Mandu, Dist. Ramgarh (Jharkhand) by Damodar Valley Corporation (DVC) is a proposed power project in Pachanda, Mandu, Ramgarh, Jharkhand. The site covers 7,627.4 acres.
Who is building it?
The applicant is Damodar Valley Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Pachanda, Mandu, Ramgarh, Jharkhand.
How big is it?
It has a stated cost of ₹2.3 crore; a site of 7,627.4 acres and 2.1 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 18 Nov 2026.
Project details
| Official title | Construction of 33 KV line for supply of 2 MVA power at 33kV level to KBP Mining Pvt. Ltd. from Loc.No. 85 (Tapping Point) of Existing 33kV CCL- Kedla Double Circuit Line to KBPOCP Sub station at Vill: Basantpur, Khata No. 14, Plot No. 99P, Anchal: Mandu, Dist. Ramgarh (Jharkhand) by Damodar Valley Corporation (DVC). |
|---|---|
| Status | Initial checks |
| Status since | 19 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Damodar Valley Corporation |
| Land area | 7,627.4 acres (3,086.7 ha) |
| Forest land | 2.1 acres (0.8 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Pachanda |
| Taluk / tehsil | Mandu |
| District | Ramgarh |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02436 |
In context
13 applications in Ramgarh since January 2022 are in the same category (Power): 3 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. At 7,627.4 acres, this one is larger than 83% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pachanda, Mandu, Ramgarh, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kotre Basantpur Pachmo OCP — environmental approval granted, 50 m away
- Kedla Dania railway siding — under forest review, 1.5 km away
- Kedla Opencast Project — environmental approval granted, 2.8 km away
- Basantpur Tapin Coking Coal Washery — environmental approval granted, 3.3 km away
- Basantpur Tapin Coking Coal Washery — environmental approval granted, 3.3 km away
- Jharkhand Laiyo (Phase I) OCP — cleared for impact study, 3.8 km away
- Jhrakhand-Laiyo Ocp — lapsed, 4 km away
- Expansion of West Bokaro Opencast Mine — withdrawn, 5.2 km away
More from Damodar Valley Corporation in Ramgarh
- Diversion of Forest Land for Shifting/Diversion of 132 KV Patratu -… — lapsed
- 220 KV transmission line of M/s Tata Steel Ltd. from Village Bhadwa, Plot 76… — lapsed
- Underground 33 KV transmission line from existing location no. 19 of Giddi… — forest land use approved
- 220 KV transmission line to M/S Tata Steel Ltd. at Vill: Ghatotand, Plot 165… — lapsed
5 Damodar Valley Corporation projects in Ramgarh
All 16 Damodar Valley Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.