Quick answers
What is this project?
High Level Golpahari Bridge at Km 40.766 With Approaches (Design Chainage From Km 39.700 to Km 41.500) on NH-419 in the State of Jharkhand on Epc Mode (Job No- Nh-419/Ap/Ranchi/2021- 22-318) is a lapsed road project in Bhandaro, Jamtara, Jharkhand. The site covers 248.3 acres.
Who is building it?
The applicant is Dilip Kumar Sah.
Has it been approved?
No. The application was lapsed on 2 Oct 2025, so it is no longer under consideration.
Where is it?
In Bhandaro, Jamtara, Jharkhand.
How big is it?
It has a stated cost of ₹58.1 crore; a site of 248.3 acres and 1.1 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 21 Aug 2025.
Project details
| Official title | Construction of High Level Golpahari Bridge at Km 40.766 With Approaches (Design Chainage From Km 39.700 to Km 41.500) on NH-419 in the State of Jharkhand on Epc Mode (Job No- Nh-419/Ap/Ranchi/2021- 22-318) |
|---|---|
| Status | Lapsed |
| Status since | 2 Oct 2025 |
| Application filed | 21 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Dilip Kumar Sah |
| Land area | 248.3 acres (100.5 ha) |
| Forest land | 1.1 acres (0.5 ha) |
| Project cost | ₹58.1 crore |
| Village / locality | Bhandaro |
| Taluk / tehsil | Jamtara |
| District | Jamtara |
| State | Jharkhand |
| Location from | Site boundary on record |
| Our reference | WID-JH-02450 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhandaro, Jamtara, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction to 2-lane with paved shoulder from Rupnarayanpur to Pokhariya… — more information requested, 0 m away
- Chandradipa Stone Mine — environmental approval granted, 4.8 km away
- Chandradipa Stone Mine — environmental approval granted, 4.8 km away
- Chandradipa Stone Mine — lapsed, 4.8 km away
- Chandradipa Stone Deposit (Area 2.169 ha. or 5.36 Acres) — environmental approval granted, 5 km away
- Chandradipa Stone Deposit (Area 2.169 ha. or 5.36 Acres) — cleared for impact study, 5 km away
- Shree Sai Enterprises — environmental approval granted, 5.1 km away
- Phuljori Stone Deposit — environmental approval granted, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.