What is Developing? Open the mapMap

Decision issuedOther · Purbi Singhbhum, Jharkhand

Diversion of Protected Forest Land, Area-4.6440 Hectare (Under Dalma Wildlife Sanctuary) for Utility Shifting of Up-Gradation to 4/6 Lane Elevated Corridor with paved shoulder configuration from kalimandir to Baliguma section (Km 241+940 to Km 251+962 by NHAI

Diversion of Protected Forest Land, Area-4.6440 Hectare (Under Dalma Wildlife Sanctuary) for Utility Shifting of Up-Gradation to 4/6 Lane Elevated Corridor with paved shoulder configuration from kalimandir to Baliguma section (Km 241+940 to Km 251+962 by NHAI is a project in Pordih, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The site covers 12.6 acres. Its stated project cost is ₹936.3 crore. As of 27 Nov 2026, its status is “Decision issued” (since 18 Aug 2023).

See it on the live map All projects in Purbi Singhbhum

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Protected Forest Land, Area-4.6440 Hectare (Under Dalma Wildlife Sanctuary) for Utility Shifting of Up-Gradation to 4/6 Lane Elevated Corridor with paved shoulder configuration from kalimandir to Baliguma section (Km 241+940 to Km 251+962 by NHAI is a project in Pordih, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The site covers 12.6 acres.

Who is building it?

The applicant is National Highways Authority of India (NHAI).

Has it been approved?

Yes. Its status is “Decision issued” (since 18 Aug 2023), as of 27 Nov 2026.

Where is it?

In Pordih, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand.

How big is it?

It has a stated cost of ₹936.3 crore and a site of 12.6 acres.

When was it filed?

The application was filed on 18 Aug 2023.

Project details

Official titleDiversion of Protected Forest Land, Area-4.6440 Hectare (Under Dalma Wildlife Sanctuary) for Utility Shifting of Up-Gradation to 4/6 Lane Elevated Corridor with paved shoulder configuration from kalimandir to Baliguma section (Km 241+940 to Km 251+962 in East Singhbhum district) of NH-33 under NHDP –III in the State of Jharkhand.
StatusDecision issued
Status since18 Aug 2023
Application filed18 Aug 2023
Approval soughtWildlife review
Application typeNew project
SectorOther
ApplicantNational Highways Authority of India (NHAI)
Land area12.6 acres (5.1 ha)
Project cost₹936.3 crore
Village / localityPordih
Taluk / tehsilGolmuri-Cum-Jugsalai
DistrictPurbi Singhbhum
StateJharkhand
Location fromSite boundary on record
Our referenceWID-JH-02673

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Aug 2024More information requested12.6 acres₹936.3 crore
New project filed 18 Aug 2023 (this page)Decision issued12.6 acres₹936.3 crore

In context

7 applications in Purbi Singhbhum since January 2022 are in the same category (Other): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pordih, Golmuri-Cum-Jugsalai, Purbi Singhbhum, Jharkhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.