What is Developing? Open the mapMap

WithdrawnIndustry · Samba, Jammu and Kashmir

Manufacturing of Surface Finishing Chemicals & Intermediate Chemicals by M/s. Grauer & Weil (India) Limited, Unit-II is to be set up at SIDCO Phase-II, Industrial Growth Centre Samba.

Manufacturing of Surface Finishing Chemicals & Intermediate Chemicals by M/s. Grauer & Weil (India) Limited, Unit-II is to be set up at SIDCO Phase-II, Industrial Growth Centre Samba is a withdrawn industrial project in Palth, Samba, Jammu and Kashmir. The site covers 3.1 acres. Its stated project cost is ₹56.2 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 12 Oct 2023).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since12 Oct 2023
Application filed12 Oct 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJaspal Singh
Land area3.1 acres (1.3 ha)
Project cost₹56.2 crore
Village / localityPalth
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00025

In context

26 applications in Samba since January 2022 are in the same category (Industry): 12 approved, 2 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.1 acres, this one is smaller than 62% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Palth, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.