Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Jan 2025 |
| Application filed | 15 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Choudhary Power Projects Private Limited |
| Land area | 24.4 acres (9.9 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Danwal |
| Taluk / tehsil | Akhnoor |
| District | Jammu |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00026 |
In context
66 applications in Jammu since January 2022 are in the same category (Mining): 38 approved, 0 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.4 acres, this one is larger than 92% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Danwal, Akhnoor, Jammu, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed Material) Mining Project, Block-54(5/29), Area of… — environmental approval granted, 0 m away
- River Bed Mining Project at Block no 5/30,Khour wali khad upstream,District… — environmental approval granted, 1.4 km away
- Minor Mineral (River Bed Material) Project at Block No. 5/31, Area 6.62 Ha. at… — lapsed, 2.5 km away
- Minor Mineral (River Bed Mineral) Mining Project, proposal for Block-5/31,… — environmental approval granted, 2.5 km away
- River Bed Mining Project at Block no 5/32 Khourwali Khad Upstream Khour Bridge… — environmental approval granted, 3.5 km away
- River Bed Mining Project Block No- 5/28 (Area 4.58 ha). — lapsed, 4.3 km away
- River Bed Material — lapsed, 4.3 km away
- River Bed Mining Project at Block No.-5/26,Jad Khad Upstream Jourian… — environmental approval granted, 4.7 km away
More from Choudhary Power Projects Private Limited in Jammu
- Proposed Minor Mineral (Nallah Muck) Block-4/J Mining ProjectBlock-4/J, an… — environmental approval granted
- Minor Mineral (River Bed Mineral) Mining project area 9.74 hectare Block… — lapsed
- Minor Mineral (River Bed Material) Mining Project, Block-5/21, Area of 9.35… — lapsed
- Minor Mineral (Nallah Muck) Mining Project, Block -29/J, At Sardan Nallah at… — withdrawn
- Minor Mineral (Nallah Muck) Mining Project, Block -13/J, Area-4.40 Ha. At… — withdrawn
- Minor Mineral (Nallah Muck) Mining Project, Block -12/J, Area-4.50 Ha. At… — withdrawn
18 Choudhary Power Projects projects in Jammu
All 24 Choudhary Power Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.