Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Dec 2024 |
| Application filed | 10 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Choudhary Power Projects Private Limited |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹16.2 crore |
| Village / locality | Hari Pur Manhasan |
| Taluk / tehsil | Jammu |
| District | Jammu |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00050 |
In context
66 applications in Jammu since January 2022 are in the same category (Mining): 38 approved, 0 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10.9 acres, this one is smaller than 80% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Hari Pur Manhasan, Jammu, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (Nallah Muck) Mining Project, Block -13/J, Area-4.40 Ha. At… — withdrawn, 0 m away
- Minor Mineral (Nallah Muck) Mining Project, Block -12/J, Area-4.50 Ha. At… — withdrawn, 950 m away
- River bed mining project Nallah Muck Block-12/J, an area of 4.50 ha; , Nikki… — environmental approval granted, 950 m away
- Expansion of Civil Enclave at Jammu Airport With an Area of 40000 M2 Proposed… — environmental approval granted, 1.7 km away
- Expansion of Civil Enclave at Jammu Airport With an Area of 40000 M2 Proposed… — under environmental review, 1.7 km away
- Expansion of Civil Enclave at Jammu Airport With an Area of 40000 M2 Proposed… — returned to applicant, 1.9 km away
- Real Estate Development of Reclaimed Land of Tawi Riverfront, Jammu — lapsed, 3.6 km away
- Real Estate Development of Reclaimed Land of Tawi Riverfront, Jammu — cleared for impact study, 3.6 km away
More from Choudhary Power Projects Private Limited in Jammu
- Proposed Minor Mineral (Nallah Muck) Block-4/J Mining ProjectBlock-4/J, an… — environmental approval granted
- Minor Mineral (River Bed Mineral) Mining project area 9.74 hectare Block… — lapsed
- Minor Mineral (River Bed Material) Mining Project, Block-5/21, Area of 9.35… — lapsed
- Minor Mineral (Nallah Muck) Mining Project, Block -29/J, At Sardan Nallah at… — withdrawn
- Minor Mineral (Nallah Muck) Mining Project, Block -13/J, Area-4.40 Ha. At… — withdrawn
- Minor Mineral (Nallah Muck) Mining Project, Block -12/J, Area-4.50 Ha. At… — withdrawn
18 Choudhary Power Projects projects in Jammu
All 24 Choudhary Power Projects projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.