Project details
| Official title | River Bed Mining Project in Minor Mineral Block -32, Pei Khad, At village -Dhabbar ,Tehsil & District - Reasi, J&K |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 May 2025 |
| Application filed | 20 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Anju Bala Sharma |
| Land area | 10.9 acres (4.4 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Aghar Balian |
| Taluk / tehsil | Reasi |
| District | Reasi |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00065 |
In context
27 applications in Reasi since January 2022 are in the same category (Mining): 22 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 10.9 acres, this one is smaller than 81% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Aghar Balian, Reasi, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Up gradation of road from MRL 22- Symbal Choya to Kanjli CHHAPANOOU under… — forest land use approved, 1.3 km away
- River Bed Mining Block no 24, District Reasi, Jammu & Kashmir. — environmental approval granted, 2.1 km away
- Link Road from L124 Anji to Panasa Road KM 4th to Mandlaian Road, Length =… — more information requested, 2.3 km away
- RBM (River Bed Material), Block-5/9 an area of 9.52 ha; Khatharwalli Khad… — lapsed, 2.8 km away
- Road From Bhagga to Pai Pai Nallah St Basti Under Nabard Ridf - Xxviii — forest land use approved, 3.9 km away
- Obtaining Extension of Environmental Clearance of the area for Minor Mineral… — environmental approval granted, 4 km away
- Minor Mineral (River Bed material) Project at Block -7, (Area-9.60 ha.), at… — environmental approval granted, 4.1 km away
- Water Supply Scheme Bhaga Pai Under Jal Jeevan Mission — forest land use approved, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.