What is Developing? Open the mapMap

Not approvedMining · Udhampur, Jammu and Kashmir

Proposed RBM (River Bed Mineral) Minor Mineral Block Mining Project, Block-II/I area 7.92 ha; , at Tawi River Downstream Salmaya Bridge, District- Udhampur J&K

Proposed RBM (River Bed Mineral) Minor Mineral Block Mining Project, Block-II/I area 7.92 ha; , at Tawi River Downstream Salmaya Bridge, District- Udhampur J&K is a rejected mining project in Sunthan, Udhampur, Jammu and Kashmir. The site covers 19.6 acres. Its stated project cost is ₹4.6 crore. As of 27 Nov 2026, its status is “Not approved” (since 19 Aug 2025).

See it on the live map All projects in Udhampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed RBM (River Bed Mineral) Minor Mineral Block Mining Project, Block-II/I area 7.92 ha; , at Tawi River Downstream Salmaya Bridge, District- Udhampur J&K is a rejected mining project in Sunthan, Udhampur, Jammu and Kashmir. The site covers 19.6 acres.

Who is building it?

The applicant is Choudhary Power Projects Private Limited.

Has it been approved?

No. The application was rejected on 19 Aug 2025.

Where is it?

In Sunthan, Udhampur, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹4.6 crore and a site of 19.6 acres.

When was it filed?

The application was filed on 4 Apr 2025.

Project details

StatusNot approved
Status since19 Aug 2025
Application filed4 Apr 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantChoudhary Power Projects Private Limited
Land area19.6 acres (7.9 ha)
Project cost₹4.6 crore
Village / localitySunthan
Taluk / tehsilUdhampur
DistrictUdhampur
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00090

In context

14 applications in Udhampur since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 19.6 acres, this one is larger than 57% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Sunthan, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 24 Choudhary Power Projects projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.